BRE DG497/2 PDF

BRE DG497/2 PDF

Name:
BRE DG497/2 PDF

Published Date:
11/16/2005

Status:
[ Active ]

Description:

Factory glazed windows. Part 2 : Transport, storage and installation

Publisher:
Building Research Establishment Limited

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?
ARCHIVED 2017 **ELECTRONIC ONLY**

Premature failure of an insulating glass unit (IGU) is often due to a rapid permeation of moisture through the edge seal and into the air gap of the unit. The reasons for premature failure investigated by BRE are numerous; these often originate with difficult conditions on building sites.

Glazing of units in factories offers the potential for higher quality work - BRE has developed good practice guidance to maximise the benefits of factory glazing. The guidance, prepared as this two-part Digest, is based on research and good practice. Part 1 introduces the subject and describes the types of insulating glazing units and production facilities.

This part (Part 2) describes the packaging, transportation to site and storage of IGUs; their installation, protection in service and maintenance; and performance testing and monitoring.


Edition : 05
File Size : 1 file , 820 KB
Number of Pages : 9
Published : 11/16/2005

History


Related products

BRE IP4/97
Published Date: 01/01/1997
Preservative-treated timber for exterior joinery: applying the new European Standards
$4.5
BRE DG452
Published Date: 11/11/2000
Whole life costing and life-cycle assessment for sustainable building design
$9
BRE IP14/82
Published Date: 01/01/1982
Trussed rafter roofs - load distributions and lateral stability
$4.5
BRE BR46
Published Date: 01/01/1984
Specification of building management systems
$11.1

Best-Selling Products

CAN/CSA-ISO GUIDE GUIDE 64-98 (R2007)
Published Date: 03/10/2000
Guide for the Inclusion of Environmental Aspects in Product Standards (Adopted ISO GUIDE 64:1997)