BRE DG523/2 PDF

BRE DG523/2 PDF

Name:
BRE DG523/2 PDF

Published Date:
02/01/2012

Status:
[ Active ]

Description:

FLOOD-RESILIENT BUILDING Part 2: Building in flood-risk areas and designing flood-resilient buildings

Publisher:
Building Research Establishment Limited

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9.3
Need Help?
ELECTRONIC ONLY

INTRODUCTION

This part of the BRE Digest on flood-resilient building covers the overall approach to building in flood-risk areas and the design of flood-resilient buildings. The approach set out here is based upon that which has been developed in the UK in recent years. ‘Avoidance', ‘resistance' and ‘resilience' are the terms used to define the different approaches to building in flood-risk areas. However, a development can contain elements of all three approaches.

Where development has taken place in flood-risk areas, it is often defended by river or coastal defences. These defences are generally designed and constructed such that they will prevent flooding of land up to a certain level. If the defences are over-topped then there is a risk that property will be flooded. It has been estimated that around 5.2 million homes in England are at risk of flooding from rivers, sea or surface water, and a further 1.1 million are at risk of failure from infrastructure such as reservoirs currently constructed in flood-risk areas in the UK[1]. In Scotland, 3.6% of homes are located in areas at risk of river or coastal flooding. There are, however, many properties that have been subject to a flood in recent years that are not in recognised flood-risk areas, often as a result of poor design of developments or poor drainage infrastructure.

In response to the flood events that have taken place in recent years, a number of flood protection products have been made available to the market. These products are suited to the protection of existing properties, but may be seen as less attractive for newbuild. Therefore, for new development, measures should be preferably applied to the building itself in order to protect it against flooding.

This part of the Digest sets out the key requirements of avoidance, resistance and resilience. Avoidance and resistance are seen as ‘water exclusion' strategies (ie keeping water out), while resilience is a ‘water entry' strategy (ie allowing water in). In reality designers may take the view that a range of measures will be necessary for different buildings on a site, or even for the same building.


Edition : 12
File Size : 1 file , 320 KB
Number of Pages : 12
Published : 02/01/2012

History


Related products

BRE DG514
Published Date: 04/30/2010
DRYING DISTORTION OF TIMBER Guidance on selection, conditioning and handling
$8.4
BRE IP17/81
Published Date: 01/01/1981
District heating combined with electricity generation: cost-effectiveness factors
$4.5
BRE DG468/1
Published Date: 06/26/2002
AAC 'aircrete' blocks and masonry
$9
BRE DG497
Published Date: 01/01/2005
Factory glazed windows
$11.1

Best-Selling Products

ABCB
Published Date: 01/01/2022
2022 National Construction Code (NCC), Complete Series (Volumes 1-3)
AG 201-1998 (AMDTS)
Published Date: 01/01/1998
Approval requirements for manual shut-off valves
Free Download
AG 201-1998 AMDTS
Published Date: 03/01/2002
Approval requirements for manual shut-off valves
AG 202-1998 (AMDTS)
Published Date: 01/01/1998
Approval requirements for gas appliance regulators (incorporates Amendments)
Free Download
AG 202-1998 AMDTS
Published Date: 06/01/2003
Approval requirements for gas appliance regulators
AG 203-1998 (AMDTS)
Published Date: 01/01/1998
Approval requirements for gas appliance thermostats
Free Download