BRE GG65/2 PDF

BRE GG65/2 PDF

Name:
BRE GG65/2 PDF

Published Date:
08/18/2005

Status:
[ Active ]

Description:

Plastering and internal rendering: Workmanship

Publisher:
Building Research Establishment Limited

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.4
Need Help?
ELECTRONIC ONLY

The acceptability of the wall and ceiling plastered finish can be a significant item in the snagging procedure. Selection of appropriate materials and techniques may not always be thorough, particularly with respect to shrinkage of backing coats and resultant cracking, and detachment of surfaces. Rigorous design procedures and quality control on site are therefore of major importance in reducing, if not eliminating, defects. This Good Building Guide addresses these issues, drawing primarily from the experience of BRE site investigations.

This Good Building Guide deals exclusively with plastering on new construction. However, some of the techniques described in Good Building Guide 7 on "Replacing failed plasterwork" (eg matching the system to the background) also apply to this Good Building Guide, and the gist of those recommendations is therefore repeated here.

This Good Building Guide does NOT deal with:

● plasterboard fixing and finishing,

● gypsum mortars, or

● plastering techniques appropriate to the restoration of heritage buildings, including:

- the use of exclusively lime-based formulations,

- scaglioli work,

- the addition of animal hair as reinforcement,

- plastering on laths,

- the running of cornices in wet plaster using wood or metal profiles, and

- the casting of decorative plaques in fibrous plaster or other surface modelling such as pargetting.

Part 1 describes the commonest types of gypsum and cement-based plasters available and the selection of suitable plastering specifications.

This part (Part 2) covers good practice during the work, dealing with storage and handling of materials, protection of surrounding construction, preparation of surfaces, control of suction, dubbing out, bonding agents, permissible deviations and restoration of defective work. It includes an illustrated checklist of good practice. 6 pages.

Both parts of GBG65 are available separately or together as a set, price 16.80 (plus P&P).


Edition : 05
File Size : 1 file , 260 KB
Number of Pages : 6
Published : 08/18/2005

History


Related products

BRE IP6/97
Published Date: 04/01/1997
External claddings using thin stone
$5.4
BRE IP16/01
Published Date: 01/01/2001
Prefabricated housing in the UK
$4.5
BRE IP17/98
Published Date: 01/01/1998
Use of lightweight veneer stone cladding panels
$4.5
BRE IP18/98
Published Date: 01/01/1998
Stone cladding panels: in-situ weathering
$4.5

Best-Selling Products

PEI RP100-05
Published Date: 2005
Recommended Practices for Installation of Underground Liquid Storage Systems
$118.5
PEI RP100-11
Published Date: 2011
Recommended Practices for Installation of Underground Liquid Storage Systems (2011 Edition)
$118.5
PEI RP100-20 Errata (Spanish)
Published Date: 2020
Errata for Recommended Practices for Installation of Underground Liquid Storage Systems (2020 Edition)
Free Download
PEI RP100-20 Errata
Published Date: 2020
Errata for Recommended Practices for Installation of Underground Liquid Storage Systems (2020 Edition)
Free Download
PEI RP100-20
Published Date: 2020
Recommended Practices for Installation of Underground Liquid Storage Systems (2020 Edition)
$118.5
PEI RP100-22
Published Date: 2022
Recommended Practices for Installation of Underground Liquid Storage Systems (2022 Edition)
$118.5