BRE IP 1/17 PDF

BRE IP 1/17 PDF

Name:
BRE IP 1/17 PDF

Published Date:
04/01/2017

Status:
[ Active ]

Description:

Flexible electrical networks for a low carbon future Network and built environment opportunities for enabling smarter networks

Publisher:
Building Research Establishment Limited

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$6.6
Need Help?
ONLY AVAILABLE HARDCOPY FORMAT

Introduction

The Department of Energy and Climate Change (DECC) report Towards a smart energy system[1] highlighted a number of challenges facing the UK’s energy system. It states: ‘most trajectories of energy demand and supply to 2050 anticipate significant new system challenges as we incorporate more low carbon generation, and meet increases in peak demand (typically 16:00 to 20:00 on winter weekdays), driven largely by the extent to which transport and heating become increasingly electrified’[1]. The report highlights that under a range of future scenarios, peak demand is forecast to increase, and in some scenarios these increases could be very significant. In order to meet the increases in demand, DECC suggests that a large increase in low carbon generation is needed as well as a smart energy system that incorporates new forms of flexibility, smarter networks, energy storage, demand side response and increased interconnectivity. The report also highlighted that it may also involve a focus on energy-efficiency improvements which target peak demand.

It is anticipated that distribution networks will be required to connect and manage increasing levels of demand from electric vehicles, heat pumps and general load increases. The distribution networks will also need to manage increased distributed generation (eg large scale renewables) and other embedded generation (eg microgeneration at the built environment level). This growth of low carbon technology on the electrical network is widely expected to be rapid, in order to achieve ambitious climate change mitigation objectives. It is also expected to be localised, eg focussed on major centres of population or by geographical areas offering significant potential for distributed generation. As a result, DNOs are expected to have limited forward visibility to enable them to plan and implement network upgrades. This introduces a risk that the rate of change within some parts of the network may exceed the capability of DNOs to respond with traditional solutions. In addition, complexities associated with demand and generation profiles for low carbon technology have the potential to significantly increase peak network flows and produce substantial voltage rises. Smarter, flexible network solutions are therefore required to deal with these issues as the rapid rate of change in how energy is generated, distributed, stored and used increases the risks associated with network integrity, as well as the quality of supply and service to customers.


Edition : 17
Number of Pages : 20
Published : 04/01/2017

History


Related products

BRE IP2/11
Published Date: 03/17/2011
ENERGY IN SCHOOLS Developing and implementing an energy management strategy
$7.5
BRE DG340
Published Date: 01/01/1989
Choosing wood adhesives
$7.5
BRE IS6
Published Date: 01/01/2003
A simple guide to in-situ ground testing; Part 6. Large-diameter plate loading tests
$8.1
BRE IP5/11
Published Date: 05/17/2011
CARBON FOOTPRINTING AND LABELLING OF CONSTRUCTION PRODUCTS
$7.5

Best-Selling Products