AASHTO T 306-11 (2023) PDF

AASHTO T 306-11 (2023) PDF

Name:
AASHTO T 306-11 (2023) PDF

Published Date:
2011

Status:
Active

Description:

Standard Method of Test for Progressing Auger Borings for Geotechnical Explorations

Publisher:
American Association of State Highway and Transportation Officials

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
aashto-t-306-11-2023_1817963

Choose Document Language:
23.40
Need Help?

This practice covers equipment and procedures for the use of earth augers in geotechnical subsurface explorations.

This procedure is applicable in soils that permit auger drilling to obtain representative or in situ samples and when information concerning resistance to driving casing or drive pipe is not necessary.


File Size : 1 file , 280 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 6
Product Code(s) : T306-11-UL, T306-11-UL, T306-11-UL
Published : 2011

History

AASHTO T 306-11 (2023)
Published Date: 2011
Standard Method of Test for Progressing Auger Borings for Geotechnical Explorations
23.40 €

Related products

AASHTO T 252-19 (2023)
Published Date: 2019
Standard Method of Test for Measurements of Pore Pressures in Soils
23.40 €
AASHTO PP 61-13 (2016)
Published Date: 2013
Standard Practice for Developing Dynamic Modulus Master Curves for Hot Mix Asphalt (HMA) Using the Asphalt Mixture Performance Tester (AMPT)
18.00 €
AASHTO T 79-22
Published Date: 2022
Standard Method of Test for Flash Point with Tag Open-Cup Apparatus for Use with Material Having a Flash Point Less Than 93°C (200°F)
25.80 €

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €