AATCC 187-2013 PDF

AATCC 187-2013 PDF

Name:
AATCC 187-2013 PDF

Published Date:
2013

Status:
Active

Description:

Dimensional Changes of Fabrics: Accelerated

Publisher:
American Association of Textile Chemists and Colorists

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$21
Need Help?

1. Purpose and Scope

1.1 This test method is an accelerated procedure for determination of the dimensional change of fabrics. The procedure uses an apparatus with programmable settings that simulate multiple home or commercial laundering actions as well as wet processing operations. 1.2 This method does not replace dimensional change test methods currently in use.


File Size : 1 file , 150 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 4
Published : 2013

History

AATCC 187-2013
Published Date: 2013
Dimensional Changes of Fabrics: Accelerated
$21
AATCC 187-2009
Published Date: 2009
Dimensional Changes of Fabrics: Accelerated (Editorial Revision -2011)
$20.4
AATCC 187-2009
Published Date: 2009
Dimensional Changes of Fabrics: Accelerated
$19.8
AATCC 187-2004
Published Date: 01/01/2004
Dimensional Changes of Fabrics: Accelerated
$18.6

Related products

AATCC 101-2019
Published Date: 2019
Colorfastness to Bleaching with Hydrogen Peroxide
$21
AATCC 191-2013
Published Date: 2013
Acid Cellulase Enzymes, Effect of: Top Loading Washer
$21
AATCC 89-2019
Published Date: 2019
Mercerization in Cotton
$21

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138