ACI 325.11R-01 PDF

ACI 325.11R-01 PDF

Name:
ACI 325.11R-01 PDF

Published Date:
01/01/2001

Status:
Active

Description:

Accelerated Techniques for Concrete Paving

Publisher:
American Concrete Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$11.1
Need Help?
Fast-track concrete paving helps contractors improve profits with time-of-completion incentives. It also helps public agencies combat increasing public impatience with traffic interruptions during pavement repair or replacement. But successful use of this powerful technology requires agencies and contractors to change traditional construction specifications and processes. Accelerated Techniques for Concrete Paving describes the needed changes and also applications for roadways, airfields, and other pavements. You'll get recommendations for planning, concrete materials and properties, jointing and joint sealing, curing and temperature control, concrete strength testing, and opening the pavement to traffic. An appendix gives flexural strength requirements for opening to traffic. These requirements vary with pavement class (municipal or highway), foundation support value, and expected loading, expressed as equivalent single-axle loads.

With the new accelerated techniques, concrete pavements can be opened to traffic in 12 to 48 hours, while traditional techniques require waits of 5 to 14 days. This fast-track approach allows transportation officials to complete projects that under normal time frames would simply not be feasible.
File Size : 1 file , 700 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 18
Published : 01/01/2001

History

ACI 325.11R-19
Published Date: 03/01/2019
Report on Accelerated Techniques for Concrete Paving
$15
ACI 325.11R-01
Published Date: 01/01/2001
Accelerated Techniques for Concrete Paving
$11.1

Related products

ACI 346M-09
Published Date: 08/01/2009
Specification for Cast-in-Place Concrete Pipe (Metric)
$10.5
ACI CODE-376-23
Published Date: 07/01/2023
Refrigerated Liquefied Gas Containment for Concrete Structures — Code Requirements and Commentary
$39.6
ACI 308.1M-11
Published Date: 07/01/2011
Standard Specification for Curing Concrete
$13.8
ACI PRC-229R-13(22)
Published Date: 06/01/2013
Report on Controlled Low-Strength Materials
$20.4

Best-Selling Products