ACI 351.1R-12 PDF

ACI 351.1R-12 PDF

Name:
ACI 351.1R-12 PDF

Published Date:
03/01/2012

Status:
Active

Description:

Grouting Between Foundations and Bases for Support of Equipment and Machinery

Publisher:
American Concrete Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$19.8
Need Help?
This report provides an overview of current practices for grouting to support equipment and machinery. Recommendations are provided for those portions of the grouting operation where a consensus could be developed among knowledgeable manufacturers and users. Various approaches are outlined for areas where opinions differ. Many statements and much of the information contained in this report are based on published manufacturers? data and observations and practical experience by technical representatives and users. There is little current published research available at this time, but the information in this report is the most current information available. This report describes materials and installation methods for grouts used as load-transfer material between machine or equipment bases and their foundations. Characteristics of the placed material, test methods for forecasting their long-term performance, and installation procedures are included. The information may also be appropriate for other types of applications where filling of the space between load-carrying members is required, such as under column baseplates or in joints between precast concrete elements.

Machinery and equipment that have precise tolerances for alignment or require uniform support cannot be placed directly on finished concrete surfaces. Both the concrete surface and the machine base have irregularities that result in alignment difficulties and bearing load concentrations. For this reason, machine bases or soleplates are aligned and leveled by shimming or other means, and the resulting space between the machine base and the foundation is filled with a load-transfer grout material. The load-transfer grout materials most frequently used are nonshrink cementitious grouts and nonshrink epoxy grouts.
File Size : 1 file , 730 KB
ISBN(s) : 9780870317583
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 25
Published : 03/01/2012

History

ACI 351.1R-12
Published Date: 03/01/2012
Grouting Between Foundations and Bases for Support of Equipment and Machinery
$19.8
ACI 351.1R-99
Published Date: 01/01/1999
Grouting Between Foundations and Bases for Support of Equipment and Machinery
$12

Related products

ACI 336.3R-14
Published Date: 08/01/2014
Design & Construction of Drilled Piers
$23.4
ACI 555R-01
Published Date: 01/01/2001
Removal and Reuse of Hardened Concrete
$16.5
ACI CODE-562-21
Published Date: 12/01/2021
ACI CODE-562-21: Assessment, Repair, and Rehabilitation of Existing Concrete Structures-Code and Commentary, Includes Errata
$49.5

Best-Selling Products

ULC 101
Published Date: 07/01/2007
Standard Methods of Fire Endurance Tests of Building Construction and Materials
ULC 101
Published Date: 06/01/2014
Standard Methods of Fire Endurance Tests of Building Construction and Materials (CAN/ULC S101-14)
$77.1
ULC 102.2
Published Date: 06/01/2018
Standard Method of Test for Surface Burning Characteristics of Flooring, Floor Coverings, and Miscellaneous Materials and Assemblies
$75
ULC 102.3
Published Date: 01/01/1982
Standard Method of Fire Test of Light Diffusers and Lenses (CAN/ULC S102.3-07)
ULC 102.4
Published Date: 07/01/2010
Standard Method of Test for Fire and Smoke Characteristics of Electrical Wiring, Cables and Non-Metallic Raceways (CAN/ULC S102.4-10)
$52.8
ULC 109
Published Date: 09/01/2014
Flame Tests of Flame Resistant Fabrics and Films (CAN/ULC S109-14)
$61.5