ACI PRC-349.2-07(20) PDF

ACI PRC-349.2-07(20) PDF

Name:
ACI PRC-349.2-07(20) PDF

Published Date:
11/01/2007

Status:
Active

Description:

Guide to the Concrete Capacity Design (CCD) Method - Embedment Design Examples

Publisher:
American Concrete Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$30
Need Help?
View contents.

ACI 349 Appendix B was developed in the mid 1970s following review of design methods and available test data. Since that time there has been extensive additional test data. In 1992, a task group was formed to compare the Appendix B methodology to that of the Concrete Capacity Design (CCD) Method for all available tests results. The review indicated that concrete breakout failures were predicted better (for example, for bolt groups, and edge conditions) by the new prediction equations in the Concrete Capacity Design Method than by the design method of Appendix B. After extensive review, ACI 349 chose to incorporate the Concrete Capacity Design Method to improve the requirements of the previous Appendix B.

Therefore, Appendix D of ACI 349 was developed to better define the design requirements for steel embedments. Revisions are periodically made to the code as a result of on-going research and testing. As with other concrete building codes, the design of steel embedments attempts to assure a ductile failure mode so that the embedment reinforcement yields before the concrete fails. In embedments designed for direct [or tensile] loading, the concrete pullout strength must be greater than the tensile strength of the steel. This report presents a series of design examples of ductile steel embedments. These examples have been updated to include the revision incorporated in Appendix D of ACI 349-06.
File Size : 1 file , 3.6 MB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 91
Published : 11/01/2007

History


Related products

ACI CODE-307-23
Published Date: 09/01/2023
Requirements for Reinforced Concrete Chimneys—Code and Commentary
$26.7
ACI 550R-96
Published Date: 01/01/1996
Design Recommendations for Precast Concrete Structures
$7.5

Best-Selling Products

NFSI B101.0-2017
Published Date: 01/11/2017
Walkway Surface Auditing Procedure for the Measurement of Walkway Slip Resistance
$19.5
NFSI B101.0-2021
Published Date: 03/12/2021
Walkway Surface Auditing Procedure for the Measurement of Walkway Slip Resistance
$19.5
NFSI B101.1-2009
Published Date: 10/13/2009
Test Method for Measuring Wet SCOF of Common Hard-Surface Floor Materials
$18
NFSI B101.1-2020
Published Date: 2020
Test Method for Measuring Wet SCOF of Common Hard-Surface Floor Materials
$18
NFSI B101.2-2020
Published Date: 2020
Test Method for Determining the Impact on Wet Coefficients of Friction of Various Chemical or Physical Walkway Surface Cleaners and Treatments on Common Hard-Surface Flooring Materials
$18
NFSI B101.3-2012
Published Date: 01/18/2012
Test Method for Measuring Wet DCOF of Common Hard-Surface Floor Materials
$18