AENOR UNE 21120-3 PDF

AENOR UNE 21120-3 PDF

Name:
AENOR UNE 21120-3 PDF

Published Date:
12/10/1992

Status:
[ Withdrawn ]

Description:

Fusibles de alta tensión. Determinación del factor de potencia de un cortocircuito durante los ensayos de los fusibles limitadores de corriente y de los fusibles de expulsión y de tipos similares.

Publisher:
Spanish Association for Standardization and Certification

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$8.1
Need Help?
W/D NO S/S


Edition : 92
File Size : 1 file , 280 KB
Number of Pages : 6
Published : 12/10/1992

History


Related products

AENOR UNE-EN ISO 4126-6
Published Date: 03/18/2015
Safety devices for protection against excessive pressure - Part 6: Application, selection and installation of bursting disc safety devices (ISO 4126-6:2014)
$33.9
AENOR UNE-EN ISO 14895
Published Date: 11/30/2016
Pequeñas embarcaciones. Hornillos de cocina y aparatos de calefacción alimentados por combustible líquido. (ISO 14895:2016).
$19.5
AENOR UNE-EN 60855-1
Published Date: 09/27/2017
Trabajos en tensión. Tubos aislantes rellenos de espuma y barras aislantes macizas. Parte 1: Tubos y barras macizas de sección circular.
$25.8
AENOR UNE-EN ISO 14122-3
Published Date: 03/01/2017
Seguridad de las máquinas. Medios de acceso permanentes a máquinas. Parte 3: Escaleras, escalas de escalones y guardacuerpos. (ISO 14122-3:2016).
$23.7

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1