AENOR UNE 25138 PDF

AENOR UNE 25138 PDF

Name:
AENOR UNE 25138 PDF

Published Date:
10/15/1959

Status:
[ Withdrawn ]

Description:

ANILLOS RODADORES PARA CILINDROS DE FRENO DE VACIO DE VEHICULOS DE FERROCARRIL

Publisher:
Spanish Association for Standardization and Certification

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?
W/D NO S/S


Edition : 59
File Size : 0 files
Published : 10/15/1959

History


Related products

AENOR UNE-EN 302-2
Published Date: 03/21/2018
Adhesivos para madera de uso estructural. Métodos de ensayo. Parte 2: Determinación de la resistencia a la delaminación.
$19.5
AENOR UNE-EN 60335-2-14
Published Date: 04/30/2008
Aparatos electrodomésticos y análogos. Seguridad. Parte 2-14: Requisitos particulares para máquinas de cocina.
$37.8
AENOR UNE-EN ISO 15848-1
Published Date: 11/25/2015
Industrial valves - Measurement, test and qualification procedures for fugitive emissions - Part 1: Classification system and qualification procedures for type testing of valves (ISO 15848-1:2015)
$51.6
AENOR UNE-EN 14817
Published Date: 09/26/2007
Railway applications - Suspension components - Air spring control elements
$28.8

Best-Selling Products

NS-ISO/IEC/IEEE 12207:2017
Published Date: 10/01/2018
Systems and software engineering — Software life cycle processes
NS-ISO/IEC/IEEE 15026-4:2021
Published Date: 06/22/2021
Systems and software engineering - Systems and software assurance - Part 4: Assurance in the life cycle
NS-ISO/IEC/IEEE 15288:2015
Published Date: 11/01/2018
Systems and software engineering — System life cycle processes
NS-ISO/IEC/IEEE 15288:2023
Published Date: 05/30/2023
Systems and software engineering — System life cycle processes
NS-ISO/IEC/IEEE 16085:2021
Published Date: 02/05/2021
Systems and software engineering — Life cycle processes — Risk management
NS-ISO/IEC/IEEE 16326:2009
Published Date: 11/01/2018
Systems and software engineering - Life cycle processes - Project management