AGMA 08FTM17 PDF

AGMA 08FTM17 PDF

Name:
AGMA 08FTM17 PDF

Published Date:
10/01/2008

Status:
[ Active ]

Description:

Innovative Concepts for Grinding Wind Power Energy Gears

Publisher:
American Gear Manufacturers Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$14.1
Need Help?

Over the past years wind power energy has gained greater importance to reduce CO2 emissions and thus antagonize global warming. The development of wind power is driven by increased performance, which requires larger wind turbines and gear boxes. The quality demands of those gears are increasing while the production cost must decrease. This requires new production methods to grind the gears. Profile grinding is known as a process to achieve highest possible quality, even for complex flank modifications, while threaded wheel grinding is known for high productivity. New machine concepts make it now possible to use both advantages at the same time. This paper will show the newest developments for cycle time reduction and increased workpiece quality using tool change systems to be able to use different grinding wheels for rough and finishing operation, workpiece clamping systems, and concepts of process integration for one workpiece flow.


Edition : 08
File Size : 1 file , 750 KB
Number of Pages : 12
Published : 10/01/2008

History


Related products

AGMA 99FTM7
Published Date: 10/01/1999
Ductile Iron as a Gear Material
$14.1
AGMA 937-A12
Published Date: 10/25/2012
Aerospace Bevel Gears
$57
AGMA 939-A07
Published Date: 01/31/2007
Austempered Ductile Iron for Gears
$45
AGMA 95FTM7
Published Date: 10/01/1995
Experimental and Analytical Assessment of the Thermal Behavior of Spiral Bevel Gears
$14.1

Best-Selling Products

CS UK CAS01
Published Date: 01/01/2003
The provision of holes in reinforced concrete beams
$7.5
CS UK CAS02
Published Date: 01/01/2014
Suspended concrete floors: maximum size of pour allowable and location of construction joints
$6
CS UK CAS03
Published Date: 02/01/2014
Straightening and rebending reinforcement on site
$6
CS UK CAS04
Published Date: 01/01/2014
Congested reinforcement: effects on placing and compacting concrete
$6
CS UK CAS05
Published Date: 04/01/2014
Holding down bolts in concrete: Suggested design procedures to BS 8110-1
$7.5
CS UK CAS06
Published Date: 01/01/2003
Reinforcement ripple
$7.5