AGMA 16FTM04 PDF

AGMA 16FTM04 PDF

Name:
AGMA 16FTM04 PDF

Published Date:
09/01/2016

Status:
[ Active ]

Description:

Twist Control Grinding (TCG)

Publisher:
American Gear Manufacturers Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$25.5
Need Help?

This paper introduces the latest process developments for the hard-finishing of gears, specifically in regard to controlling the so-called flank twist. The purpose of twist control grinding (TCG) is to either eliminate twist, to introduce a counter-twist on purpose, or to add a specific twist to counteract the deformation of gears under load. By controlling twist, the contact bearing surfaces of meshing gear sets can be fully optimized, and therefore, the forces acting on the bearing surfaces can be ideally distributed. This leads to more efficient gears, both in terms of power density and fuel consumption. Today, in terms of grinding times, twist control grinding is on par with the standard continuous generating grinding which is well-established in the industry. High volume TCG production of twist-free gears, or gears with a defined twist, is now standard production practice at several automotive gearbox manufacturers.


Edition : 16#
File Size : 1 file , 1.5 MB
Number of Pages : 13
Published : 09/01/2016

History


Related products

AGMA 12FTM23
Published Date: 10/01/2012
Enhancing Control of Distortion Through ‘One Piece Flow – Heat Treatment’
$14.1
AGMA 06FTM15
Published Date: 10/01/2006
Optimal Tooth Modifications in Spiral Bevel Gears Introduced by Machine Tool Setting Variation
$14.1
AGMA ISO 17485-A08
Published Date: 05/20/2008
Bevel Gears - ISO System of Accuracy
$69
AGMA 16FTM17
Published Date: 09/01/2016
Analysis of Excitation Behavior of a Two-Stage Gearbox Based on a Validated Simulation Model
$25.5

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138