AIA NAS355 PDF

AIA NAS355 PDF

Name:
AIA NAS355 PDF

Published Date:
07/29/2011

Status:
[ Revised ]

Description:

TUBE ASSEMBLY, CONTROL, ALUMINUM ALLOY, WITH RIVETED THREADED ROD ENDS

Publisher:
Aerospace Industries Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$19.8
Need Help?

File Size : 1 file , 30 KB
Number of Pages : 2
Published : 07/29/2011
Revision : 6

History

AIA NAS355
Published Date: 04/30/2024
TUBE ASSEMBLY, CONTROL, ALUMINUM ALLOY, WITH RIVETED THREADED ROD ENDS
$16.5
AIA NAS355
Published Date: 02/29/2016
TUBE ASSEMBLY, CONTROL, ALUMINUM ALLOY, WITH RIVETED THREADED ROD ENDS
$19.8
AIA NAS355
Published Date: 07/29/2011
TUBE ASSEMBLY, CONTROL, ALUMINUM ALLOY, WITH RIVETED THREADED ROD ENDS
$19.8
AIA NAS355
Published Date: 10/09/1991
Tube Assembly-Control Aluminum Alloy with Riveted Threaded Rod Ends
$19.8

Related products

AIA NASM16556
Published Date: 07/29/2022
PIN, STRAIGHT, HEADLESS (DOWEL) (.001 OVER NOMINAL SIZE)
$16.5
AIA NAS553
Published Date: 04/28/2023
ELBOW, UNIVERSAL, 15°
$16.5
AIA NAS726
Published Date: 08/28/2020
GEAR, SPUR, 20° INVOLUTE, LOW INERTIA, 48 AND FINER PITCH
$20.7
AIA NAS1727
Published Date: 03/31/2016
NUT, SELF-LOCKING, ALIGNING, 450 °F AND 800 °F
$16.5

Best-Selling Products

NORSOK C-001:2022
Published Date: 03/21/2022
Living quarters area
NORSOK C-004:2019+AC:2022
Published Date: 10/23/2019
Helicopter deck on offshore installations
NORSOK D-002
Published Date: 01/13/2020
Well intervention equipment
NORSOK D-007
Published Date: 03/26/2021
Well testing, clean-up and flowback systems
NORSOK D-010:2021+AC2:2021
Published Date: 12/23/2021
Well integrity in drilling and well operations
NORSOK D-010/AC:2021
Published Date: 06/23/2021
CORRIGENDUM: Well integrity in drilling and well operations