ANS 56.5-1979 (R1987) PDF

ANS 56.5-1979 (R1987) PDF

Name:
ANS 56.5-1979 (R1987) PDF

Published Date:
01/01/1979

Status:
[ Withdrawn ]

Description:

PWR and BWR Containment Spray System Design Criteria

Publisher:
American Nuclear Society

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$52.8
Need Help?

This standard provides the design, performance, testing, maintenance, and instrumentation and control requirements for the containment spray system for boiling water and pressurized water reactor stationary electric generating plants.

The containment spray system, consisting of a spray subsystem, serves to mitigate the consequences of a loss of coolant accident, a PWR Feedwater line or a PWR steam line break, by injecting a water spray into the containment atmosphere. The containment spray system may be used to aid safety by performing one or more of the following functions: (1) Containment Post-Accident Pressure Suppression (2) Containment Post-Accident Heat Removal (3) Containment Atmosphere Post-Accident Fission Product Removal (4) Post-Accident Mixing of Containment Atmosphere (5) Post-Accident Containment Sump Chemistry Control.


ANSI : ANSI Approved
File Size : 1 file , 3 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 44
Published : 01/01/1979

History


Related products

ANS 56.3-1977 (R1987)
Published Date: 01/01/1977
Overpressure Protection of Low Pressure Systems Connected to the Reactor Coolant Pressure
$23.1
ANS 56.8-2020
Published Date: 01/01/2020
Containment System Leakage Testing Requirements
$57.6
ANS 56.11-1988
Published Date: 01/01/1988
Design Criteria for Protection Against the Effects of Compartment Flooding in Light Water Reactor Plants
$28.8
ANS 57.7-1988 (R1997)
Published Date: 01/01/1988
Design Criteria for an Independent Spent Fuel Storage Installation (Water Pool Type)
$61.2

Best-Selling Products

DESTRUCTIVE TESTING METHODS
Published Date: 01/01/2010
$7.5
FLUX CORED ARC WELDING
Published Date: 01/01/2012
$9
GAS METAL ARC WELDING
Published Date: 01/01/2012
$9
GAS TUNGSTEN ARC WELDING
Published Date: 01/01/2012
$9
HIWT DESTRUCTIVE TESTING METHO
Published Date: 01/01/2007
DESTRUCTIVE TESTING METHODS
NONDESTRUCTIVE TESTING METHODS
Published Date: 01/01/2009
$8.4