API Bull 97 PDF

API Bull 97 PDF

Name:
API Bull 97 PDF

Published Date:
11/01/2013

Status:
Active

Description:

Well Construction Interface Document Guidelines, FIrst Edition

Publisher:
American Petroleum Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$21.9
Need Help?
This bulletin provides guidance on information that is to be shared regarding well construction and rig-specific operating guidelines. It is intended to align the lease operator's safety and environmental management system (SEMS) with drilling contractor's safe work practices (CSWP).

The WCID-SEMS is a bridging document that includes the elements identified in API 75 within the context of well construction activities. It is understood that work processes vary between operators and contractors, which should be honored in the development of the WCID document.

The intent of the bridging document between the lease operator's SEMS and the CSWP is to provide:

a) an outline of responsibilities for the lease operator's and drilling contractor's personnel;

b) acknowledgement that management of change (MOC) and risk assessment processes should be used:
--during well construction activities,
--to address personnel or organizational changes to ensure personnel skill level is sufficient for the applicable position;

c) a vehicle for the drilling contractor to be involved when operational changes and/or conditions are identified that could require a well activity risk assessment;

d) a method to align all parties with regard to drilling HSE standards and applicable regulatory requirements;

e) a method of communication of the stop work authority.

The WCID-well plan contains the following elements:

a) well design:
--location and environment,
--geological and geophysical;

b) well barrier plan risk identification;

c) well execution plan.

To enhance safe operations, the well plan provides a basis for discussion of well construction equipment, barriers, risks, and the mitigations for those risks.
Edition : 1st
File Size : 1 file , 300 KB
Note : This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
Number of Pages : 18
Product Code(s) : G09701, G09701, G09701
Published : 11/01/2013

History


Related products

API RP 50 (R2013)
Published Date: 12/01/1995
Natural Gas Processing Plant Practices For Protecting the Environment
$36.6
API RP 87 (R2022)
Published Date: 08/01/2007
Recommended Practice for Field Analysis of Crude Oil Samples Containing from Two to Fifty Percent Water by Volume, First Edition
$30.3
API RP 92U (R2013)
Published Date: 11/01/2008
Underbalanced Drilling Operations, First Edition
$35.1
API RP 90-1
Published Date: 08/01/2021
Recommended Practice 90-1, Annular Casing Pressure Management for Offshore Wells, Second Edition
$70.2

Best-Selling Products

MEDDEV 13/93
Published Date:
Guidelines Relating to the Application of: The Council Directive 90/385/EEC on Active Implantable Medical Devices and The Council Directive 93/42/EEC on Medical Devices
MEDDEV 2.1/3
Published Date: 03/01/1998
Guidelines Relating to the Demarcation Between 90/385/EEC on Active Implatable Medical Devices, 93/42/EEC on Medical Devices,65/65/EEC Relating to Medicinal Products & Related Directives
MEDDEV 3/94
Published Date: 04/01/1994
Guidelines Relating to the Application of : The Council Directive 90/385/EEC on Active Implantable Medical Devices and The Council Directive 93/42/EEC on Medical Devices