This document assists gas-lift system operators, analysts, technicians, engineers, and others in understanding how to effectively plan, operate, maintain, troubleshoot and provide surveillance for gas-lift systems and gas-lift wells.
These recommended practices discuss continuous gas-lift with injection in the casing/tubing annulus and production up the tubing. Annular flow gas-lift (injection down the tubing and production up the annulus), dual gas-lift (two tubing strings in the same casing), and intermittent gas-lift are mentioned; however, most of the discussion focuses on conventional continuous gas-lift.
| Edition : | 1st |
| File Size : | 1
file
, 1.4 MB |
| Note : | This product is unavailable in Ukraine, Russia, Cuba, Syria, Belarus, Iran, North Korea |
| Number of Pages : | 99 |
| Product Code(s) : | G19G51, G19G51, G19G51 |
| Published : | 07/01/2019 |