API RP 2I (R2020) PDF

API RP 2I (R2020) PDF

Name:
API RP 2I (R2020) PDF

Published Date:
04/01/2008

Status:
Active

Description:

In-service Inspection of Mooring Hardware for Floating Structures, Third Edition

Publisher:
American Petroleum Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$49.5
Need Help?
API Recommended Practice (RP) 2I provides guidelines for inspecting mooring components of Mobile Offshore Drilling Units (MODUs) and permanent floating installations. It is an extension of the second edition, which addressed in-service inspection of mooring components for MODUs only. Major changes in this edition include:
  • inspection guidelines for steel permanent moorings on permanent floating installations are added;
  • inspection guidelines for fiber ropes used for permanent and MODU moorings are included;
  • special guidance for MODU mooring inspection in the areas of tropical cyclone is provided.
Although this recommended practice was developed for the primary moorings of MODUs and permanent floating installations, some of the guidelines may be applicable to moorings of other floating vessels such as pipe-laying barges and construction vessels. Also some of the guidelines may be applicable to secondary or emergency moorings such as mooring for jack-up units, shuttle tanker mooring, and dynamic positioning (DP) vessel harbor mooring. The applicability of this document to other floating vessels and moorings is left to the discretion of the user.
ANSI : ANSI Approved
Edition : 3rd
File Size : 1 file , 16 MB
Note : This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
Number of Pages : 73
Product Code(s) : G02103, G02103, G02103
Published : 04/01/2008
Redline File Size : 2 files , 19 MB

History

API RP 2I (R2020)
Published Date: 04/01/2008
In-service Inspection of Mooring Hardware for Floating Structures, Third Edition
$49.5
API RP 2I
Published Date: 11/01/1996
Recommended Practice for In-Service Inspection of Mooring Hardware for Floating Drilling Units
$43.2

Related products

API RP 2L (R2012)
Published Date: 05/01/1996
Planning, Designing, and Constructing Heliports for Fixed Offshore Platforms
$27.9
API TR 5C3
Published Date: 06/01/2018
Calculating Performance Properties of Pipe Used as Casing or Tubing, Seventh Edition, Includes Addendum 1
$75.9
API Spec 5DP
Published Date: 05/01/2020
Drill Pipe, Second Edition, Includes Errata 1 (2020)
$66.6
API Spec 2C
Published Date: 10/01/2020
Offshore Pedestal-mounted Cranes, Eighth Edition, Includes Errata 1 (2021)
$54

Best-Selling Products