API RP 545 and 545-A SET PDF

API RP 545 and 545-A SET PDF

Name:
API RP 545 and 545-A SET PDF

Published Date:
10/01/2009

Status:
[ Withdrawn ]

Description:

Lightning Protection of Aboveground Storage Tanks for Flammable or Combustible Liquids (API RP 545) and Verification of Lightning Protection Requirements for Aboveground Hydrocarbon Storage Tanks (API/EI 545-A), First Edition

Publisher:
American Petroleum Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
api-rp-545-and-545-a-set_1651127

Choose Document Language:
69.00 €
Need Help?
API RP 545, Recommended Practice for Lightning Protection of Above Ground Storage Tanks for Flammable or Combustible Liquids, First Edition, replaces the requirements of API 2003 regarding lightning protection for preventing fires in storage tanks with flammable or combustible contents. This recommended practice (RP) provides guidance and information to assist owners/operators with lightning protection for tanks. This RP does not provide complete protection for all possible lightning stroke occurrences.

API/EI Research Report 545-A, Verification of Lightning Protection Requirements for Aboveground Hydrocarbon Storage Tanks, First Edition, collates a number of research reports investigating the lightning phenomena and the adequacy of lightning protection requirements on above ground hydrocarbon storage tanks. These are as follows:
  • review of lightning phenomena and the interaction with above ground storage tanks,
  • review of tank base earthing and test current recommendations,
  • lightning tests to tank shell/shunt samples,
  • visits to oil refinery A and B,
  • review of burn-through and hot-spot effects on metallic tank skins from lightning strikes,
  • lightning simulation testing to determine the required characteristics for roof bonding cables on external floating roof above ground storage tanks,
  • investigative tests on the lightning protection of submerged shunts with parallel roof bonding cables.

Edition : 1st
File Size : 2 files , 22 MB
Note : This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
Product Code(s) : C, C, C
Published : 10/01/2009

History


Related products

API RP 545
Published Date: 10/01/2009
Lightning Protection of Aboveground Storage Tanks for Flammable or Combustible Liquids, First Edition
33.90 €
API 545-A
Published Date: 10/01/2009
Verification of Lightning Protection Requirements for Aboveground Hydrocarbon Storage Tanks, First Edition
44.70 €
API RP 500
Published Date: 06/01/2023
Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1, and Division 2, Fourth Edition
94.80 €
API Std 546
Published Date: 05/01/2022
Brushless Synchronous Machines - 500 kVA and Larger, Fourth Edition
69.60 €

Best-Selling Products

AICHE B-2
Published Date: 01/01/1986
DIERS: Technology Summary Emergency Relief Systems for Runaway Chemical Reactions and Storage Vessels: A Summary of Multiphase Flow Methods
19.50 €
AICHE B-3
Published Date: 01/01/1986
DIERS: Small/Large Scale Experimental Data and Analysis
37.50 €
AICHE B-4
Published Date: 01/01/1986
DIERS: Bench-Scale Apparatus Design and Test Results Large Scale Polystyrene-Ethylbenzene High Viscosity Two-Phase Flow Test Report
15.00 €
AICHE C-19
Published Date: 01/01/2001
CCPS: Making EHS an Integral Part of Process Design
20.40 €
AICHE E-24
Published Date: 01/01/1987
TRAY DISTILLATION COLUMNS A Guide to Performance Evaluation
7.50 €
AICHE E-29
Published Date: 04/29/1993
PARTICLE SIZE CLASSIFIERS
19.50 €