API RP 5UE (R2020) PDF

API RP 5UE (R2020) PDF

Name:
API RP 5UE (R2020) PDF

Published Date:
06/01/2005

Status:
Active

Description:

Recommended Practice for Ultrasonic Evaluation of Pipe Imperfections, Second Edition, Includes Addendum 1 (2009)

Publisher:
American Petroleum Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$26.7
Need Help?
Please note that any addenda or errata may not be included in translated editions of this standard.

This recommended practice describes procedures which may be used to "prove-up" the depth or size of imperfections.

Included in this practice are the recommended procedures for ultrasonic prove-up inspection of new pipe using the Amplitude Comparison Technique and the Amplitude-Distance Differential Technique for evaluation of 1) surface breaking imperfections in the body of pipe and 2) surface breaking and subsurface imperfections in the weld area of electric resistance, electric induction or laser welded pipe and 3) surface breaking and subsurface imperfections in the weld area of arc welded pipe.


Edition : 2nd
File Size : 1 file , 1.3 MB
Note : This product is unavailable in Ukraine, Russia, Cuba, Syria, Belarus, Iran, North Korea
Number of Pages : 36
Product Code(s) : G5UE02R, G5UE02, G5UE02R, G5UE02, G5UE02
Published : 06/01/2005

History

API RP 5UE (R2020)
Published Date: 06/01/2005
Recommended Practice for Ultrasonic Evaluation of Pipe Imperfections, Second Edition, Includes Addendum 1 (2009)
$26.7
API RP 5UE
Published Date: 03/01/2002
Recommended Practice for Ultrasonic Evaluation of Pipe Imperfections
$43.2

Related products

API RP 5B1 (R2024)
Published Date: 08/01/1999
Gauging and Inspection of Casing, Tubing and Pipe Line Threads
$47.7
API RP 5LW (R2015)
Published Date: 09/01/2009
Recommended Practice for Transportation of Line Pipe on Barges and Marine Vessels, Third Edition
$20.1
API RP 55 (R2013)
Published Date: 02/15/1995
Conducting Oil and Gas Producing and Gas Processing Plant Operations Involving Hydrogen Sulfide
$38.4

Best-Selling Products

UNE-CLC/TS 50131-2-2:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-2: Requirements for passive infrared detectors
UNE-CLC/TS 50131-2-3:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-3: Requirements for microwave detectors
UNE-CLC/TS 50131-2-4:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-4: Requirements for combined passive infrared and microwave detectors
UNE-CLC/TS 50131-2-5:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-5: Requirements for combined passive infrared and ultrasonic detectors
UNE-CLC/TS 50131-2-6:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-6: Requirements for opening contacts (magnetic)
UNE-CLC/TS 50131-3:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 3: Control and indicating equipment