API Spec 8C Errata 2 PDF

API Spec 8C Errata 2 PDF

Name:
API Spec 8C Errata 2 PDF

Published Date:

Status:
Active

Description:

Errata to Specification for Drilling and Production Hoisting Equipment (PSL 1 and PSL 2), Fifth Edition

Publisher:
American Petroleum Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$Free Download
Need Help?

File Size : 1 file , 87 KB
Note : This product is unavailable in Russia, Cuba, Syria, Belarus, Iran, North Korea
Number of Pages : 1

History


Related products

API Spec 8C (R2019)
Published Date: 03/01/2012
Specification for Drilling and Production Hoisting Equipment (PSL 1 and PSL 2), Fifth Edition, Includes Errata 1 ( 2014) and Errata 2 (2020)
$47.1
API RP 8B
Published Date: 05/01/2014
Inspections, Maintenance, Repair and Remanufacture of Hoisting Equipment, Eighth Edition, Includes Addendum 1 (2019) and 2 (2021) and Errata 1 (2019)
$31.8
API RP 8FV1
Published Date: 10/01/2024
Field Verification of Rig Devices for Oil and Gas Well Drilling Operations, First Edition
$26.1

Best-Selling Products

SN-ISO/TR 10013:2001
Published Date: 01/14/2002
Guidelines for quality management system documentation
SN-ISO/TR 14062:2002
Published Date: 11/11/2002
Environmental management - Integrating environmental aspects into product design and development
SN-ISO/TR 14069:2013
Published Date: 06/11/2015
Greenhouse gases - Quantification and reporting of greenhouse gas emissions for organizations - Guidance for the application of ISO 14064-1
SN-ISO/TR 15489-2:2001
Published Date: 11/01/2008
Information and documentation — Records management — Part 2: Guidelines
SN-ISO/TR 15499:2012
Published Date: 07/01/2014
Biological evaluation of medical devices — Guidance on the conduct of biological evaluation within a risk management process
SN-ISO/TR 19083-1:2016
Published Date: 07/13/2023
Intelligent transport systems - Emergency evacuation and disaster response and recovery - Part 1: Framework and concept of operation