API TR 941-A Addendum 1 PDF

API TR 941-A Addendum 1 PDF

Name:
API TR 941-A Addendum 1 PDF

Published Date:
06/01/2019

Status:
Active

Description:

Addendum to The Technical Basis Document for API RP 941, First Edition

Publisher:
American Petroleum Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$Free Download
Need Help?
IMPORTANT: The designation/number for this document has changed from TR 941 to TR 941-A. This is to differentiate it from RP 941.
File Size : 1 file , 83 KB
Note : This product is unavailable in Russia, Cuba, Syria, Belarus, Iran, North Korea
Number of Pages : 1
Published : 06/01/2019

History


Related products

API TR 939-B
Published Date: 06/01/2002
Repair and Remediation Strategies for Equipment Operating in Wet H2S Service
$57.3
API TR 939-D
Published Date: 05/01/2007
Technical Report 939-D - Stress Corrosion Cracking of Carbon Steel in Fuel Grade Ethanol: Review and Survey, Second Edition, Includes Addendum 1 (2013)
$53.7
API Std 936
Published Date: 03/01/2024
Refractory Installation Quality Control-Inspection and Testing Monolithic Refractory Linings and Materials, Fifth Edition
$45
API RP 571
Published Date: 03/01/2020
Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, Third Edition
$115.5

Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9