ARINC 768A PDF

ARINC 768A PDF

Name:
ARINC 768A PDF

Published Date:
06/19/2023

Status:
[ Active ]

Description:

SECOND GENERATION INTEGRATED SURVEILLANCE SYSTEM (2G ISS)

Publisher:
Aeronautical Radio Incorporated

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
arinc-768a_2725182

Choose Document Language:
73.50 €
Need Help?

Purpose of this Document

This document provides standards for a second-generation Integrated Surveillance System (2G ISS) that may be configured to suit a wide variety of aircraft installations. The 2G ISS may include components and modules to perform multiple surveillance functions:

• Airborne Collision Avoidance System (ACAS), specifically ACAS-Xa

• Air Traffic Control Transponder (ATCRBS/Mode S)

• Terrain Awareness and Warning System (TAWS)

• Automatic Dependent Surveillance – Broadcast (ADS-B) OUT/IN

• Distance Measuring Equipment (DME)

This document uses a building block approach to define a second-generation ISS with a combination of surveillance functions. This document establishes interoperability standards for the second-generation ISS (2G ISS). The 2G ISS is intended for installation on commercial air transport aircraft with digital interfaces (ARINC 429 or ARINC 664) with primary applicability to future aircraft and derivatives of the current generation production aircraft. This document provides standards for equipment form factor, signal interfaces, aircraft interwiring and connector pin allocation.

The minimum operational and performance capabilities of the 2G ISS are further described in the related RTCA and EUROCAE Minimum Operational Performance Standards (MOPS) and Minimum Aviation System Performance Standards (MASPS) documents for ACAS, Mode S transponder, TAWS, ADS-B OUT/IN, and DME where ACAS in this document is meant to include ACAS-Xa and ACAS-Xo. Section 1.8 provides a list of reference documents.

The primary goal of the 2G ISS is to simplify aircraft installations and reduce life cycle costs through integration, as well as providing meaningful operational benefits. Another goal is to establish an enabling platform for future surveillance capabilities.


Edition : 23#
File Size : 1 file , 920 KB
Number of Pages : 69
Published : 06/19/2023

History


Related products

ARINC 600-20
Published Date: 07/11/2017
AIR TRANSPORT AVIONICS EQUIPMENT INTERFACES
114.00 €
ARINC 747-3
Published Date: 06/07/2011
FLIGHT DATA RECORDER
73.50 €
ARINC 741P1-15
Published Date: 12/23/2019
AVIATION SATELLITE COMMUNICATION SYSTEMS PART 1 AIRCRAFT INSTALLATION PROVISIONS
114.00 €
ARINC 757-6
Published Date: 08/05/2015
COCKPIT VOICE RECORDER (CVR)
90.30 €

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
36.00 €
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
36.00 €
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
36.00 €
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
36.00 €
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
36.00 €
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
36.00 €