ARMY AR 700-127 PDF

ARMY AR 700-127 PDF

Name:
ARMY AR 700-127 PDF

Published Date:
09/27/2007

Status:
[ Revised ]

Description:

INTEGRATED LOGISTICS SUPPORT

Publisher:
United States Army Publication

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
army-ar-700-127_2745522

Choose Document Language:
17.70 €
Need Help?

Applicability.

This regulation applies to the Active Army, the Army National Guard/Army National Guard of the United States, and the U.S. Army Reserve, unless otherwise stated. This regulation is applicable during full mobilization unless otherwise stated.

Purpose

This regulation sets the policy for planning, developing, acquiring and sustaining well-defined, affordable support strategies that meet the war fighter's requirements for Army materiel throughout its life cycle. The policy —

a. Defines a deliberate process that the Program Manager (PM) uses to develop and integrate the support strategy into the system engineering process (SEP) to ensure a design can be supported throughout its lifecycle.

b. Identifies the framework (ten Integrated Logistics Support (ILS) elements) that will be used to develop the support strategy.

c. Assigns responsibilities for developing the support strategy.

d. Sets the policy for developing support strategies in support of Army materiel.

e. Outlines responsibilities for implementing support strategies.

f. Implements total life-cycle logistics requirements outlined in Department of Defense Directive (DODD) 5000.1 and DOD Instruction (DODI) 5000.2.


Edition : 07
File Size : 1 file , 1000 KB
Number of Pages : 80
Published : 09/27/2007

History

ARMY AR 700-127
Published Date: 02/20/2024
Integrated Product Support
17.10 €
ARMY AR 700-127
Published Date: 10/22/2018
Integrated Product Support
16.80 €
ARMY AR 700-127
Published Date: 10/11/2016
Integrated Product Support
17.10 €
ARMY AR 700-127
Published Date: 10/07/2014
Integrated Product Support
16.80 €
ARMY AR 700-127
Published Date: 07/17/2008
INTEGRATED LOGISTICS SUPPORT
18.30 €
ARMY AR 700-127
Published Date: 09/27/2007
INTEGRATED LOGISTICS SUPPORT
17.70 €
ARMY AR 700-127
Published Date: 12/19/2005
INTEGRATED LOGISTICS SUPPORT
14.40 €
ARMY AR 700-127
Published Date: 11/10/1999
INTEGRATED LOGISTICS SUPPORT
15.60 €
ARMY AR 700-127
Published Date: 07/17/1990
INTEGRATED LOGISTICS SUPPORT
15.30 €

Related products

ARMY UFGS-32 12 19.16
Published Date: 11/01/2019
RESIN-MODIFIED ASPHALT PAVING WEARING COURSES
11.40 €
ARMY UFGS-13 49 10
Published Date: 02/01/2009
X-RAY SHIELDING
10.80 €
ARMY UFGS-10 21 13
Published Date: 08/01/2017
TOILET COMPARTMENTS
10.80 €
ARMY DA PAM 415-28
Published Date: 02/11/2000
GUIDE TO ARMY REAL PROPERTY CATEGORY CODES
21.60 €

Best-Selling Products

ISO/TR 10013:2001
Published Date: 07/15/2001
Guidelines for quality management system documentation
33.30 €
ISO/TR 10014:1998
Published Date: 08/01/1998
Guidelines for managing the economics of quality
15.90 €
ISO/TR 10017:2003
Published Date: 05/15/2003
Guidance on statistical techniques for ISO 9001:2000
44.70 €
ISO/TR 10064-1:1992
Published Date: 02/01/1992
Cylindrical gears - Code of inspection practice - Part 1: Inspection of corresponding flanks of gear teeth
55.50 €
ISO/TR 10064-1:2017
Published Date: 07/01/2017
Code of inspection practice - Part 1: Measurement of cylindrical gear tooth flanks
69.60 €
ISO/TR 10064-1:2019
Published Date: 10/01/2019
Code of inspection practice - Part 1: Measurement of cylindrical gear tooth flanks
83.40 €