ARMY UFGS-05 59 10 PDF

ARMY UFGS-05 59 10 PDF

Name:
ARMY UFGS-05 59 10 PDF

Published Date:
08/01/2018

Status:
[ Revised ]

Description:

ROLLING COVER FOR AVIATION REFUELING VAULTS

Publisher:
United States Army Publication

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
army-ufgs-05-59-10_2727059

Choose Document Language:
10.20 €
Need Help?

NOTE:

This guide specification covers the requirements for custom fabricated rolling covers installed on new or existing aircraft refueling system vaults constructed to the requirements of the DoD Type III/IV/V, and Cut and Cover Hydrant Refueling System Standards. DoD Type III systems must conform to Standard Design AW 078-24-28 DOD PRESSURIZED HYDRANT FUELING SYSTEM TYPE III. DoD Type IV/V systems must conform to Standard Design AW 078-24-29 DOD STANDARD PRESSURIZED HYDRANT DIRECT FUELING SYSTEM TYPE IV/V. Cut and Cover systems must conform to Standard Design AW 078-24-33 CUT AND COVER STANDARDS.


Edition : 18
File Size : 1 file , 56 KB
Number of Pages : 13
Published : 08/01/2018

History


Related products

ARMY UFGS-01 91 00.15 10
Published Date: 05/01/2019
TOTAL BUILDING COMMISSIONING
14.70 €
ARMY AR 140-158
Published Date: 12/17/1997
ENLISTED PERSONNEL CLASSIFICATION, PROMOTION, AND REDUCTION
20.10 €
ARMY ARMY TM 5-662
Published Date: 02/01/1986
SWIMMING POOL OPERATION AND MAINTENANCE
17.10 €
ARMY AR 611-105
Published Date: 05/30/2024
Selection, Training, and Suitability for Explosive Ordnance Disposal
10.50 €

Best-Selling Products

Operation of Small Wastewater Systems
Published Date: 08/01/1997
11.70 €
Small Water Systems Operation & Maintenance
Published Date: 02/01/1999
7.80 €
Water Treatment Plant Operation, Volume 1
Published Date: 07/01/1999
11.70 €