ARMY UFGS-23 52 43.00 10 PDF

ARMY UFGS-23 52 43.00 10 PDF

Name:
ARMY UFGS-23 52 43.00 10 PDF

Published Date:
04/01/2008

Status:
[ Withdrawn ]

Description:

HEAT RECOVERY BOILERS

Publisher:
United States Army Publication

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$16.5
Need Help?

NOTE: This guide specification covers the requirements for both fire-tube and water-tube heat recovery, steam generating boilers with individual capacities from 907 to 136,000 kg 2,000 to 300,000 pounds of steam per hour.


Edition : 08
File Size : 1 file , 210 KB
Number of Pages : 68
Published : 04/01/2008

History


Related products

ARMY UFGS-03 23 00
Published Date: 05/01/2016
STRESSED TENDON REINFORCING
$10.2
ARMY ARMY FM 20-11
Published Date: 01/20/1999
HEADQUARTERS, DEPARTMENT OF THE ARMY
$48
ARMY AMC P 715-17
Published Date: 03/15/1994
GUIDE FOR THE PREPARATION AND USE OF PERFORMANCE SPECIFICATIONS
$23.4
ARMY AR 380-5
Published Date: 02/25/1988
DEPARTMENT OF THE ARMY INFORMATION SECURITY PROGRAM
$22.2

Best-Selling Products

JEDEC EIA 318-B
Published Date: 07/01/1996
MEASUREMENT OF REVERSE RECOVERY TIME FOR SEMICONDUCTOR SIGNAL DIODES
$17.7
JEDEC EIA 323 (R2002)
Published Date: 03/01/1966
AIR-CONVECTION-COOLED, LIFE TEST ENVIRONMENT FOR LEAD-MOUNTED SEMICONDUCTOR DEVICES
$15.3
JEDEC EIA 365 (R1984)
Published Date: 11/01/1969
PERFORMANCE TEST PROCEDURE FOR SOLAR CELLS AND CALIBRATION PROCEDURE FOR SOLAR CELL STANDARDS FOR SPACE VEHICLE SERVICE
$17.7
JEDEC EIA 397-1
Published Date: 07/01/1980
ADDENDUM No. 1 TO EIA-397
$31.8
JEDEC EIA 397
Published Date: 06/01/1972
RECOMMENDED STANDARD FOR THYRISTORS
$68.4
JEDEC EIA 557B
Published Date: 02/01/2006
STATISTICAL PROCESS CONTROL SYSTEMS
$22.2