ARMY UFGS-33 61 13.13 PDF

ARMY UFGS-33 61 13.13 PDF

Name:
ARMY UFGS-33 61 13.13 PDF

Published Date:
02/01/2016

Status:
[ Active ]

Description:

PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION

Publisher:
United States Army Publication

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$11.1
Need Help?

NOTE:

This guide specification covers the requirements for prefabricated underground distribution system for chilled water, low temperature hot water (less than 95 degrees C 200 degrees F) or dual temperature water.


Edition : 16
File Size : 1 file , 65 KB
Number of Pages : 21
Published : 02/01/2016

History


Related products

ARMY UFGS-07 27 10.00 10
Published Date: 08/01/2019
BUILDING AIR BARRIER SYSTEM
$11.4
ARMY UFGS-35 20 15
Published Date: 08/01/2018
FRP COMPOSITES FOR LOW-HEAD WATER CONTROL STRUCTURES
$11.7
ARMY AR 600-43
Published Date: 05/15/1998
CONSCIENTIOUS OBJECTION
$11.4
ARMY AR 95-2
Published Date: 03/31/2016
Air Traffic Control, Airfield/Heliport, and Airspace Operations
$19.5

Best-Selling Products

Machinery Component Maintenance & Repair
Published Date: 09/01/1997
$29.7