MP 28.C19-1978 PDF

MP 28.C19-1978 PDF

Name:
MP 28.C19-1978 PDF

Published Date:
01/01/1978

Status:
[ Superseded ]

Description:

Commentary on AS 1480, SAA Concrete Structures Code, Part C19: Footings

Publisher:
Standards Australia MP Series

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$3.96
Need Help?
The requirements with regard to footings are straightforward, being the result more of the application of sound engineering judgment than of any rigorous analysis. Compatible with this, it is permissible to assume that the distribution of soil pressures under a footing other than a pile cap is linear in both directions.
Edition : 1st
File Size : 1 file
Number of Pages : 2
Product Code(s) : 10138825
Published : 01/01/1978

History

AS 3600:2018 Sup 1:2022
Published Date: 03/25/2022
Concrete structures - Commentary (Supplement 1 to AS 3600:2018)
$50.886
AS 3600-2009 Supp 1:2014
Published Date: 12/05/2014
Concrete Structures - Commentary (Supplement to AS 3600-2009)
$61.38
AS 3600 SUPP 1-1990
Published Date: 07/02/1998
Concrete structures - Commentary (Supplement to AS 3600-1988)
AS 3600 SUPP 1-1994
Published Date: 10/10/1994
Concrete structures - Commentary (Supplement to AS 3600-1994)
$36.63
MP 28.C25-1978
Published Date: 01/01/1978
Commentary on AS 1480, SAA Concrete Structures Code, Part C25: Composite concrete flexural members
$1.98
MP 28.C22-1978
Published Date: 01/01/1978
Commentary on AS 1480, SAA Concrete Structures Code, Part C22: Rectangular slabs supported on four sides
$12.078
MP 28.C21-1978
Published Date: 01/01/1978
Commentary on AS 1480, SAA Concrete Structures Code, Part C21: Slab systems having multiple square or rectangular panels
$12.078
MP 28.C19-1978
Published Date: 01/01/1978
Commentary on AS 1480, SAA Concrete Structures Code, Part C19: Footings
$3.96
MP 28.C23-1978
Published Date: 01/01/1978
Commentary on AS 1480, SAA Concrete Structures Code, Part C23: Special provisions for hollow-block slab construction and concrete-joist slab
$12.078
MP 28.C6-1977
Published Date: 01/01/1977
Commentary on AS 1480, SAA Concrete Structures Code, Part C6: Details of reinforcement
$12.078
MP 28.C11-1977
Published Date: 01/01/1977
Commentary on AS 1480, SAA Concrete Structures Code, Part C11: Development of stress in reinforcement
$12.078
MP 28.C12-1977
Published Date: 01/01/1977
Commentary on AS 1480, SAA Concrete Structures Code, Part C12: General
$15.048
MP 28.C13-1977
Published Date: 01/01/1977
Commentary on AS 1480, SAA Concrete Structures Code, Part C13: Loading and effective strength
$12.078
MP 28.C15-1977
Published Date: 01/01/1977
Commentary on AS 1480, SAA Concrete Structures Code, Part C15: Shear and torsion
$12.078
MP 28.C14-1977
Published Date: 01/01/1977
Commentary on AS 1480, SAA Concrete Structures Code, Part C14: General principles of bending and bending combined with axial compression
$12.078
MP 28.C10-1975
Published Date: 01/01/1975
Commentary on AS 1480, SAA Concrete Structures Code, Part C10: Serviceability
$8.712
MP 28.C26-1975
Published Date: 01/01/1975
Commentary on AS 1480, SAA Concrete Structures Code, Part C26: Evaluation of the serviceability of existing structures
MP 28.C4-1975
Published Date: 01/01/1975
Commentary on AS 1480, SAA Concrete Structures Code, Part C4: Quality of concrete
MP 28.C9-1975
Published Date: 01/01/1975
Commentary on AS 1480, SAA Concrete Structures Code, Part C9: General requirements
$12.078

Related products

MP 29-1975
Published Date: 01/01/1975
SAA guide for consumer Standards
$12.078
MP 9-1942
Published Date: 01/01/1942
Interim report on the anti-scatter protection of glass
$10.296
MP 71-1993
Published Date: 01/01/1993
Telecommunications equipment type approvals
$40.392
MP 48-2008
Published Date: 05/05/2008
Certified gas cylinder test stations
$29.304

Best-Selling Products

Physical Chemistry
Published Date: 08/01/2000
$11.4