ASD-STAN PREN 2996-001 PDF

ASD-STAN PREN 2996-001 PDF

Name:
ASD-STAN PREN 2996-001 PDF

Published Date:
05/31/2005

Status:
[ Revised ]

Description:

Aerospace Series Circuit Breakers, Three-Pole, Temperature Compensated, Rated Current 1 A to 25 A Part 001: Technical Specification

Publisher:
Aerospace and Defence Industries Association of Europe - Standardization

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?

Edition : P3
Number of Pages : 19
Published : 05/31/2005

History

ASD-STAN PREN 2996-001
Published Date: 09/01/2021
Aerospace series Circuit breakers, three-pole, temperature compensated, rated currents 1 A to 25 A — Part 001: Technical specification
$48.6
ASD-STAN PREN 2996-001
Published Date: 05/31/2005
Aerospace Series Circuit Breakers, Three-Pole, Temperature Compensated, Rated Current 1 A to 25 A Part 001: Technical Specification

Related products

ASD-STAN PREN 3745-203
Published Date: 09/01/2006
Aerospace series Fibres and cables, optical, aircraft use Test methods Part 203: Cable dimensions
$6.6
ASD-STAN PREN 4839-003
Published Date: 12/01/2016
Aerospace series Arc Fault Circuit breakers, three-pole, temperature compensated, rated current 3 A to 25 A, 115/200 V a.c. 400 Hz constant frequency Part 003: Without auxiliary contacts Product standard
$34.5
ASD-STAN PREN 6129
Published Date: 11/01/2005
Aerospace series Blind bolt, Protruding head, high strength
$26.1
ASD-STAN PREN 3830
Published Date: 04/28/1995
Aerospace Series Electrical System Load Analysis
$39.6

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138