ASM SS-591 PDF

ASM SS-591 PDF

Name:
ASM SS-591 PDF

Published Date:
04/01/1995

Status:
Active

Description:

PARALLOY H39W - Cast Heat Resistant Alloy

Publisher:
ASM International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
View Sample Alloy Digest Data Sheet (PDF)

Since 1952, Alloy Digest has been the leading reference for materials property data on metals and alloys used throughout the world. Featuring graphs, charts and tables, these sheets give facts and figures on composition or characterization, physical and mechanical properties, heat treatment, and machinability.

PARALLOY H39W is commonly known as HP Nb(Cb) modified and has excellent high temperature mechanical strength as well as resistance to carburization and oxidation. It is used in severe petrochemical service up to 1100 C (2010 F).
File Size : 1 file , 130 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 04/01/1995

History


Related products

ASM SS-235
Published Date: 03/01/1970
ACI TYPE CF-8C - Corrosion Resisting Casting Alloy
$7.5
ASM SS-283
Published Date: 11/01/1972
IN-833 - Cast Stainless Steel
$7.5
ASM SS-303
Published Date: 12/01/1974
ACI TYPE HK - Heat Resistant Cast Stainless Steel
$7.5
ASM SS-315
Published Date: 08/01/1975
ACI TYPE CB-30 - Corrosion Resistant Cast Stainless Steel
$7.5

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1