ASME NOG-1-2004 PDF

ASME NOG-1-2004 PDF

Name:
ASME NOG-1-2004 PDF

Published Date:
01/01/2004

Status:
Active

Description:

Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)

Publisher:
ASME International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$51
Need Help?

This Standard covers electric overhead and gantry multiple girder cranes with top running bridge and trolley used at nuclear facilities and components of cranes at nuclear facilities.


ANSI : ANSI Approved
File Size : 1 file , 1.1 MB
ISBN(s) : 0791829391
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 148
Product Code(s) : A1190T, A1190T, A1190T
Published : 01/01/2004

History

ASME NOG-1-2020
Published Date: 12/04/2020
Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
$53.7
ASME NOG-1-2010
Published Date: 07/12/2010
Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
$51
ASME NOG-1-2004
Published Date: 01/01/2004
Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
$51

Related products

ASME B40.100-2022
Published Date: 12/15/2022
Pressure Gauges and Gauge Attachments
$49.5
ASME NUM-1–2023
Published Date: 05/17/2024
Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)
$76.5
ASME B30.2-2022
Published Date: 08/24/2022
Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)
$25.2

Best-Selling Products