ASTM D6842-02e1 PDF

ASTM D6842-02e1 PDF

Name:
ASTM D6842-02e1 PDF

Published Date:
12/10/2002

Status:
Active

Description:

Standard Guide for Designing Cost-Effective Sampling and Measurement Plans by Use of Estimated Uncertainty and Its Components in Waste Management Decision-Making

Publisher:
ASTM International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18
Need Help?

1.1 Waste management decisions generally involve uncertainty because of the fact that decisions are based on the use of sample data. When uncertainty can be reduced or controlled, a better decision can be achieved. One way to reduce or control uncertainty is through the estimation and control of the components contributing to the overall uncertainty (or variance). Control of the sizes of these variance components is an optimization process. The optimizations results can be used to either improve an existing sampling and analysis plan (if it should be found to be inadequate for decision-making purposes) or to optimize a new plan by directing resources to where the overall variance can be reduced the most.

1.2 Estimation of the variance components from the total variance starts with the sampling and measurement process. The process involves two different kinds of uncertainties: random and systematic. The former is associated with imprecision of the data, while the latter is associated with bias of the data. This guide will discuss only sources of uncertainty of a random nature.

1.3 There may be many sources of uncertainty in waste management decisions. However, this guide does not intend to address the issue of how these sources are identified. It is the responsibility of the stakeholders and their technical staff to analyze the sampling and measurement processes in order to identify the potentially significant sources of uncertainty. After identifying these sources, this guide will provide guidance on how to collect and analyze data to obtain an estimate of the total uncertainty and its components.


File Size : 1 file , 90 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 5
Published : 12/10/2002

History

ASTM D6842-02(2007)
Published Date: 02/01/2007
Standard Guide for Designing Cost-Effective Sampling and Measurement Plans by Use of Estimated Uncertainty and Its Components in Waste Management Decision-Making (Withdrawn 2015)
$18
ASTM D6842-02e1
Published Date: 12/10/2002
Standard Guide for Designing Cost-Effective Sampling and Measurement Plans by Use of Estimated Uncertainty and Its Components in Waste Management Decision-Making
$18
ASTM D6842-02
Published Date: 12/10/2002
Standard Guide for Designing Cost-Effective Sampling and Measurement Plans by Use of Estimated Uncertainty and Its Components in Waste Management Decision-Making
$17.4

Related products

ASTM E828-81(2004)e1
Published Date: 07/31/1981
Standard Test Method for Designating the Size of RDF-3 From its Sieve Analysis (Withdrawn 2009)
$18
ASTM D6323-19
Published Date: 02/01/2019
Standard Guide for Laboratory Subsampling of Media Related to Waste Management Activities
$16.8
ASTM D4448-01(2019)
Published Date: 02/01/2019
Standard Guide for Sampling Ground-Water Monitoring Wells
$16.2
ASTM D5633-21
Published Date: 05/01/2021
Standard Practice for Sampling with a Scoop
$13.8

Best-Selling Products

UKCAA ACN 2023-10-0246
Published Date: 10/12/2023
Airspace Co-Ordination Notice - Aerial Survey Walney Isle of Man Bioflight
UKCAA CAP 393
Published Date: 04/22/2003
Air Navigation: The Order and the Regulations
UKCAA CAP 393
Published Date: 04/22/2003
Air Navigation: The Order and the Regulations
UKCAA CAP 393
Published Date: 04/22/2003
Air Navigation: The Order and the Regulations
UKCAA CAP 393
Published Date: 04/22/2003
Air Navigation: The Order and the Regulations
UKCAA CAP 393
Published Date: 04/22/2003
Air Navigation: The Order and the Regulations
$35.7