ASTM E2452-05 PDF

ASTM E2452-05 PDF

Name:
ASTM E2452-05 PDF

Published Date:
07/01/2005

Status:
Active

Description:

Standard Practice for Equipment Management Process Maturity (EMPM) Model

Publisher:
ASTM International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.4
Need Help?

1.1 This practice covers a process for the assessment and reporting of an entitys overall equipment management process maturity (EMPM).

1.2 The highest value is placed on continuous improvement as reflected in measured increases in maturity over time.

1.3 The EMPM model is designed to be applicable and appropriate for all equipment-holding entities, however, the EMPM may not be the only acceptable assessment model available.

1.4 It includes all aspects of equipment management.

1.5 In addition to applicability to equipment and equipment management as defined in this practice, this practice may in whole or in part be effectively applied to intangible property, real property, and material.

1.6 There is great variation across organizations regarding the internal departments that accomplish the various aspects of equipment management. Thus, all criteria are not applicable to all entities.

1.7 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.


File Size : 1 file , 97 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 7
Published : 07/01/2005

History

ASTM E2452-12(2019)
Published Date: 05/01/2019
Standard Practice for Equipment Management Process Maturity (EMPM) Model
$14.4
ASTM E2452-12
Published Date: 09/15/2012
Standard Practice for Equipment Management Process Maturity (EMPM) Model
$17.4
ASTM E2452-10
Published Date: 07/01/2010
Standard Practice for Equipment Management Process Maturity (EMPM) Model
$17.4
ASTM E2452-05e1
Published Date: 07/01/2005
Standard Practice for Equipment Management Process Maturity (EMPM) Model
$17.4
ASTM E2452-05
Published Date: 07/01/2005
Standard Practice for Equipment Management Process Maturity (EMPM) Model
$17.4

Related products

ASTM E2004-18(2024)
Published Date: 10/01/2024
Standard Test Method for Facing Cleavage of Sandwich Panels
$18.3
ASTM E1974-19
Published Date: 07/01/2019
Standard Specification for Shelter, Electrical Equipment S-250/G
$16.2
ASTM E2168-10(2023)
Published Date: 05/01/2023
Standard Classification for Allowance, Contingency, and Reserve Sums in Building Construction Estimating
$17.1
ASTM E2430/E2430M-19
Published Date: 04/01/2019
Standard Specification for Expanded Polystyrene (“EPS”) Thermal Insulation Boards for Use in Exterior Insulation and Finish Systems (“EIFS”)
$15

Best-Selling Products

NS-ISO/IEC/IEEE 12207:2017
Published Date: 10/01/2018
Systems and software engineering — Software life cycle processes
NS-ISO/IEC/IEEE 15026-4:2021
Published Date: 06/22/2021
Systems and software engineering - Systems and software assurance - Part 4: Assurance in the life cycle
NS-ISO/IEC/IEEE 15288:2015
Published Date: 11/01/2018
Systems and software engineering — System life cycle processes
NS-ISO/IEC/IEEE 15288:2023
Published Date: 05/30/2023
Systems and software engineering — System life cycle processes
NS-ISO/IEC/IEEE 16085:2021
Published Date: 02/05/2021
Systems and software engineering — Life cycle processes — Risk management
NS-ISO/IEC/IEEE 16326:2009
Published Date: 11/01/2018
Systems and software engineering - Life cycle processes - Project management