ASTM E3010-15(2019)e1 PDF

ASTM E3010-15(2019)e1 PDF

Name:
ASTM E3010-15(2019)e1 PDF

Published Date:
04/01/2019

Status:
Active

Description:

Standard Practice for Installation, Commissioning, Operation, and Maintenance Process (ICOMP) of Photovoltaic Arrays

Publisher:
ASTM International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.4
Need Help?

1.1''This practice details the minimum requirements for installation, commissioning, operations, and maintenance processes to ensure safe and reliable power generation for the expected life of the photovoltaic system. Specifically dealing with commercial photovoltaic installations, this practice covers a broad spectrum of designs and applications and is focused on the proper process to ensure quality.

1.2''This practice does not cover the electrical aspects of installation found in existing and national codes and does not replace or supersede details of electrical installation covered by the same. The practice does address the integration of best practices into design and construction.

1.3''This practice shall not dictate specific design criteria or favor any product or technology.

1.4''This practice shall be focused on the proper, documented process required to build and operate a quality PV plant as defined in Section 3.

1.5''Integration of best practices shall be relevant to this standard and promote a mechanism for rapid evolution and reaction to changes or events. Conformity assessment for PV power plants is being developed through the IEC System for Certification to Standards Relating to Equipment for Use in Renewable Energy Applications (IECRE System). Sandia Labs has developed several model documents that may be adopted as acceptable consensus standards through other standards development organizations.

1.6''The standard is divided into three key areas:

1.6.1''Design, engineering, and construction of the PV plant. Systems should be designed with operation and maintenance (O&M) in mind. Further standards should be developed for building integrated or building mounted systems, modules with embedded power electronics, lightweight flexible modules, or other specific components.

1.6.2''Commissioning, testing, and approval for power generation (Utility Witness Testing). Standards for owner acceptance will also be addressed.

1.6.3''O&M of the PV plant including performance monitoring, periodic inspection, preventive maintenance, and periodic re-commissioning.

1.7''Safety and hazard considerations unique to this application, such as worker fall protection, electrical exposure, accessibility of modules, and roof clearance (around the perimeter of the array) are addressed by other codes, standards, or authorities having jurisdiction.

1.8''This practice provides guidelines for minimum processes required and must be used in conjunction with applicable codes and standards, government regulations, manufacturer requirements, and best practices.

1.9''This practice is not intended to replace or supersede any other applicable local codes, standards or Licensed Design Professional instructions for a given installation.

1.10''This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

1.11''This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.


File Size : 1 file , 950 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 11
Published : 04/01/2019

History

ASTM E3010-15(2019)e1
Published Date: 04/01/2019
Standard Practice for Installation, Commissioning, Operation, and Maintenance Process (ICOMP) of Photovoltaic Arrays
$17.4
ASTM E3010-15(2019)
Published Date: 04/01/2019
Standard Practice for Installation, Commissioning, Operation, and Maintenance Process (ICOMP) of Photovoltaic Arrays
$20.7

Related products

ASTM E823-81(2001)
Published Date: 05/29/1981
Standard Practice for Nonoperational Exposure and Inspection of a Solar Collector (Withdrawn 2010)
$18
ASTM E668-20
Published Date: 07/01/2020
Standard Practice for Application of Thermoluminescence-Dosimetry (TLD) Systems for Determining Absorbed Dose in Radiation-Hardness Testing of Electronic Devices
$16.8
ASTM F1640-21
Published Date: 06/15/2021
Standard Guide for Selection and Use of Contact Materials for Foods to Be Irradiated
$13.8
ASTM E1143-05(2019)
Published Date: 04/01/2019
Standard Test Method for Determining the Linearity of a Photovoltaic Device Parameter with Respect To a Test Parameter
$12.6

Best-Selling Products

ISO/HL7 10781:2015
Published Date: 08/01/2015
Health Informatics - HL7 Electronic Health Records-System Functional Model, Release 2 (EHR FM)
$71.1
ISO/HL7 16527:2016
Published Date: 08/01/2016
Health informatics - HL7 Personal Health Record System Functional Model, Release 1 (PHRS FM)
$71.1
ISO/HL7 21731:2014
Published Date: 08/01/2014
Health informatics - HL7 version 3 - Reference information model - Release 4
$66.9
ISO/HL7 27931:2009
Published Date: 08/01/2009
Data Exchange Standards - Health Level Seven Version 2.5 - An application protocol for electronic data exchange in healthcare environments
$83.4
ISO/HL7 27932:2009
Published Date: 08/01/2009
Data Exchange Standards - HL7 Clinical Document Architecture, Release 2
$83.4
ISO/HL7 27951:2009
Published Date: 08/01/2009
Health informatics - Common terminology services, release 1
$83.4