ASTM F1698-96 PDF

ASTM F1698-96 PDF

Name:
ASTM F1698-96 PDF

Published Date:
01/01/1996

Status:
Active

Description:

Standard Practice for Installation of Poly(Vinyl Chloride)(PVC) Profile Strip Liner and Cementitious Grout for Rehabilitation of Existing Man-Entry Sewers and Conduits

Publisher:
ASTM International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
astm-f1698-96_16345

Choose Document Language:
18.60 €
Need Help?

1.1 This practice describes the procedures for the rehabilitation of sewer lines and conduits by the installation of a field-fabricated PVC liner. After installation of the liner, cementitious grout is injected into the annular space between the liner and the existing sewer or conduit. The rehabilitation of the host structure by this installation practice results in a rigid composite structure (PVC/grout/existing pipe). This rehabilitation process may be used in a variety of gravity applications, such as sanitary sewers, storm sewers, and process piping of man-entry sizes (36 to 144 in. vertical dimension). The profile strips used for field fabrication of PVC liners are supplied in coils for spiral winding of the liner or in custom-cut flat panels for circumferential lining of all or any portion of the circumference of the host conduit (see Figs. 1 and 2).

1.2 The values in parentheses are provided for information purposes only.

1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Particular attention is drawn to those safety regulations and requirements involving entering into and working in confined spaces.


File Size : 1 file , 92 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 5
Published : 01/01/1996

History

ASTM F1698-21
Published Date: 07/01/2021
Standard Practice for Installation of Poly(Vinyl Chloride)(PVC) Profile Strip Liner and Cementitious Grout for Rehabilitation of Existing Man-Entry Sewers and Conduits
15.60 €
ASTM F1698-02(2015)e1
Published Date: 03/01/2015
Standard Practice for Installation of Poly(Vinyl Chloride)(PVC) Profile Strip Liner and Cementitious Grout for Rehabilitation of Existing Man-Entry Sewers and Conduits
18.60 €
ASTM F1698-02(2008)
Published Date: 03/01/2008
Standard Practice for Installation of Poly(Vinyl Chloride)(PVC) Profile Strip Liner and Cementitious Grout for Rehabilitation of Existing Man-Entry Sewers and Conduits
17.40 €
ASTM F1698-02
Published Date: 09/10/2002
Standard Practice for Installation of Poly(Vinyl Chloride)(PVC) Profile Strip Liner and Cementitious Grout for Rehabilitation of Existing Man-Entry Sewers and Conduits
17.40 €
ASTM F1698-96
Published Date: 01/01/1996
Standard Practice for Installation of Poly(Vinyl Chloride)(PVC) Profile Strip Liner and Cementitious Grout for Rehabilitation of Existing Man-Entry Sewers and Conduits
18.60 €

Related products

ASTM F512-19(2024)
Published Date: 01/15/2024
Standard Specification for Smooth-Wall Poly(Vinyl Chloride) (PVC) Conduit and Fittings for Underground Installation
18.90 €
ASTM F1973-21
Published Date: 11/01/2021
Standard Specification for Factory Assembled Anodeless Risers and Transition Fittings in Polyethylene (PE) and Polyamide 11 (PA11) and Polyamide 12 (PA12) Fuel Gas Distribution Systems
16.20 €
ASTM C582-23
Published Date: 04/01/2023
Standard Specification for Contact-Molded Reinforced Thermosetting Plastic (RTP) Laminates for Corrosion-Resistant Equipment
17.10 €
ASTM D1527-99(2005)
Published Date: 08/01/2005
Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Plastic Pipe, Schedules 40 and 80 (Withdrawn 2014)
18.00 €

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants