ATIS ATIS-0600040.2024 PDF

ATIS ATIS-0600040.2024 PDF

Name:
ATIS ATIS-0600040.2024 PDF

Published Date:
07/01/2024

Status:
Active

Description:

Fault Managed Power Distribution Technologies – Human Contact Fault Analysis

Publisher:
The Alliance for Telecommunications Industry Solutions

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$124.5
Need Help?

This technical report includes requirements for a centralized powering approach that can be used to support distributed powered nodes such as those utilized in 5G cellular network deployment. This centralized powering solution leverages a single connection to an energy source such as renewables or the commercial power grid to deliver power to multiple remotely located elements that can be installed thousands of feet away from the centralized power source with a previously unattainable combination of safety and transmission efficiency. These Fault Managed Power Systems (FMPSs) employ sophisticated monitoring and controls, including an electronic handshake to verify that the powered device (PD) is present and operating correctly before greater than Class 2 power is applied to the circuit. This TR establishes a human contact fault analysis methodology to determine whether a risk of ventricular fibrillation exists in powering systems evaluated to the criteria herein.


ANSI : ANSI Approved
File Size : 1 file , 9.6 MB
Published : 07/01/2024

History

ATIS ATIS-0600040
Published Date: 07/02/2024
Fault Managed Power Distribution Technologies – Human Contact Fault Analysis
$124.5
ATIS ATIS-0600040.2024
Published Date: 07/01/2024
Fault Managed Power Distribution Technologies – Human Contact Fault Analysis
$124.5
ATIS ATIS-0600040
Published Date: 12/01/2021
Fault Managed Power Distribution Technologies - Human Contact Fault Analysis
$99

Related products

ATIS 0600010.02.2012(S2022)
Published Date: 01/17/2012
Equipment Handling, Transportation Vibration and Rail Car Shock Requirements for Network Telecommunications Equipment
$43.5
ATIS 0600012.04
Published Date: 11/10/2017
Electrical Protection for Fast Access to Subscriber Terminals (G.fast)
$43.5
ATIS 0600015.09.2020
Published Date: 08/01/2020
Methodology for Measurement and Reporting of Base Station Metrics for Telecommunication Equipment: Power Consumption & Energy Performance
$43.5
ATIS 0600336.2020
Published Date: 11/01/2020
Design Requirements for Universal Cabinets and Framework
$43.5

Best-Selling Products