ATIS J-STD-102.a PDF

ATIS J-STD-102.a PDF

Name:
ATIS J-STD-102.a PDF

Published Date:

Status:
Active

Description:

Supplement A to J-STD-102, Joint ATIS/TIA CMAS Federal Alert Gateway to CMSP Gateway Interface Test Specification

Publisher:
The Alliance for Telecommunications Industry Solutions

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$25.5
Need Help?
This Standard defines the operational testing procedures for communications between the Federal Alert Gateway and the Commercial Mobile Service Provider (CMSP) Gateway over the Reference Point "C" Interface including any processing functionality within the FEMA-administered Commercial Mobile Alert Service (CMAS) entities and within the CMSP-administered CMAS entities that directly impact communications over the Reference Point "C" Interface.

Purpose:

The purpose of interface testing is to evaluate whether systems or components transmit data and control information correctly to each other. In addition, the tests defined in this Standard may be used during regression testing when updates are made to either the Federal Alert Gateway or the CMSP Gateway.

Specifically, the Joint ATIS/TIA CMAS Federal Alert Gateway to CMSP Gateway Interface Testing Specification defines a set of tests to verify the following minimal set of functionality during interface and regression testing:
  • Ability to complete the C-Interface startup procedures:
  • Ability to bring up the IPSec tunnel.
  • Ability to bring up the TCP/IP connection.
  • Ability to receive, process, and acknowledge valid CMAS Alert, Update, Cancel, and RequiredMonthly Test (RMT) messages.
  • Ability to handle transmission control cease and resume messages.
  • Ability to handle link test messages.
  • Ability to perform CAP retrieval.


This Standard is not intended to define test cases for the complete development lifecycle, nor is it intended to provide complete requirements verification or complete compliance testing. Requirements verification testing is typically performed during the unit, integration, and system testing phases and is beyond the scope of this Standard.
File Size : 1 file , 480 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 12

History


Related products

ATIS 1000672.2000(S2020)
Published Date: 11/01/2000
Bearer Independent Call Control
$99
ATIS 1000112.2005(S2020)
Published Date: 07/01/2005
Signaling System No. 7 (SS7) - Signaling Connection Control Part (SCCP)
$177
ATIS 1000005
Published Date: 02/01/2005
Service Description of ETS
$43.5
ATIS 1000665.1997(S2018)
Published Date: 01/01/1997
Broadband ISDN - Overview of ANSI B-ISDN NNI Signaling Capability Set 2, Step 1 (formerly T1.665-1997 (R2008) )
$33

Best-Selling Products

SN/TS 3031:2016
Published Date: 11/15/2016
Energy performance of buildings - Calculation of energy needs and energy supply
SN/TS 3032:2024
Published Date: 07/05/2024
Energy performance of buildings - Calculation of heating, cooling and power demand
SN/TS 3079:2010
Published Date: 04/28/2010
Strength graded structural timber - Dimensions
SN/TS 3160:2017
Published Date: 10/01/2017
Module based doors, windows and recessing for locking systems
SN/TS 3183:2008
Published Date: 12/01/2008
Solid softwood panelling for interior use
SN/TS 3186:2008
Published Date: 12/01/2008
Solid softwood cladding for exterior use