AWS B2.1-5A-226 PDF

AWS B2.1-5A-226 PDF

Name:
AWS B2.1-5A-226 PDF

Published Date:
01/01/1999

Status:
[ Revised ]

Description:

Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding (Consumable Insert Root) followed by Shielded Metal Arc Welding of Chromium-Molybdenum Steel (M-5A/P-5A), 1/8 through 1/2 in. Thick, As-Welded Condition; 1/8 through 1-1/2 in. Thick, PWHT Condition, IN521, ER90S-B3, and E9018-B3, Primarily Pipe Applications

Publisher:
American Welding Society

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$94.8
Need Help?

The data to support this Standard Welding Procedure Specification (SWPS) were derived from the above-listed Procedure Qualification Records (PQRs) which were reviewed and validated under the auspices of the Welding Research Council. This SWPS is not valid using conditions and variables outside the ranges listed. The American Welding Society considers that this SWPS presents information for producing an acceptable weld using the conditions and variables listed. The user needs a significant knowledge of welding and accepts full responsibility for the performance of the weld and for providing the engineering capability, qualified personnel, and proper equipment to implement this SWPS.


ANSI : ANSI Approved
Edition : 99
File Size : 1 file , 320 KB
Number of Pages : 26
Published : 01/01/1999

History

AWS B2.1-5A-226
Published Date: 01/01/2022
Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding (Consumable Insert Root) followed by Shielded Metal Arc Welding of Chromium-Molybdenum Steel (M-5A/ P-5A), IN521, ER90S-B3, and E9018-B3, 1/8 inch [3 mm] through 1/2 inch [13 mm] Thick, As-Welded Condition; 1/8 inch [3 mm] through 1-1/2 inch [38 mm] Thick, PWHT Condition, Primarily Pipe Applications
$98.4
AWS B2.1-5A-226
Published Date: 01/01/1999
Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding (Consumable Insert Root) followed by Shielded Metal Arc Welding of Chromium-Molybdenum Steel (M-5A/P-5A), 1/8 through 1/2 in. Thick, As-Welded Condition; 1/8 through 1-1/2 in. Thick, PWHT Condition, IN521, ER90S-B3, and E9018-B3, Primarily Pipe Applications
$94.8
AWS B2.1-5A-226
Published Date: 01/01/1999
Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding (Consumable Insert Root) Followed by Shielded Metal Arc Welding of Chromium-Molybdenum Steel (M-5A/P-5A), 1/8 Through 1/2 in. Thick, As-Welded Condition, 1/8 Through 1-1/2 in. Thick, PWHT Condition, IN521, ER90S-B3, and E9018-B3, Primarily Pipe Applications
$94.8

Related products

AWS BUNDLE C
Published Date: 01/01/2018
AWS STRUCTURAL BUNDLE – BUNDLE C: AWS A2.4 2012 and AASHTOAWS D1.5M/D1.5 2015-AMD1
$177.6
AWS B2.1-1-233
Published Date: 01/01/2020
Standard Welding Procedure Specification (SWPS) for 75% Argon Plus 25% Carbon Dioxide Shielded Gas Metal Arc Welding (Short Circuiting Transfer Mode) followed by 98% Argon Plus 2% Oxygen Shielded Gas Metal Arc Welding (Spray Transfer Mode) of Carbon Steel (M-1/P-1, Group 1 or 2), 1/8 inch [3 mm] through 1-1/2 inch [38 mm] Thick, ER70S-3, in the As-Welded or PWHT Condition, Primarily Pipe Applications
$98.4
AWS C3.2M/C3.2
Published Date: 01/01/2001
Standard Method for Evaluating the Strength of Brazed Joints
$19.2
AWS B2.1-1-202
Published Date: 01/01/2019
Standard Welding Procedure Specification (SWPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1, Group 1 or 2), 1/8 inch [3 mm] through 3/4 inch [19 mm] Thick, E6010 (Vertical Downhill) Followed by E7018 (Vertical Uphill), in the As-Welded Condition, Primarily Pipe Applications
$98.4

Best-Selling Products

DIN/IEC 212
Published Date: 09/01/1995
Standard Conditions for Use Prior to and During the Testing of Solid Electrical Insulating Materials - GERMAN ONLY
DIN/IEC 60512-2 Amendment 1
Published Date: 08/01/1995
Electromechanical Components for Electronic Equipment - Basic Testing Procedures and Measuring Methods - Part 2: General Examination, Electrical Continuity and Contact Resistance Tests, Insulation Tests and Voltage Stress Tests - GERMAN ONLY
DIN/IEC 60512-2
Published Date: 05/01/1994
Electromechanical Components for Eelectronic Equipment; Basic Testing Procedures and Measuring Methods; Part 2: General Examination, Electrical Continuity and Contact Resistance Tests, Insulation Tests and Voltage Stress Tests - GERMAN ONLY
DIN/IEC 60512-3
Published Date: 05/01/1994
Electromechanical Components for Electronic Equipment; Basic Testing Procedures and Measuring Methods; Part 3: Current-Carrying Capacity Tests - GERMAN ONLY
DIN/IEC 60512-4
Published Date: 05/01/1994
Electromechanical Components for Electronic Equipment; Basic Testing Procedures and Measuring Methods; Part 4: Dynamic Stress Tests - GERMAN ONLY
DIN/IEC 60512-5
Published Date: 05/01/1994
Electromechanical Components for Electronic Equipment; Basic Testing Procedures and Measuring Methods; part 5: Impact Tests (Free Components), Static Load Tests (Fixed Components), Endurance Tests and Overload Tests - GERMAN ONLY