AWWA ACE54270 PDF

AWWA ACE54270 PDF

Name:
AWWA ACE54270 PDF

Published Date:
06/01/2001

Status:
Active

Description:

Structuring Alternative Project Delivery Procurement

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The rise of alternative project delivery methods over the last decade has provided water and wastewater utility managers the opportunity to draw from a spectrum of options, each with their relative advantages and disadvantages, for delivery of capital projects. This spectrum of options ranges from traditional delivery methods to various forms of integration of design, construction, operations and financing. This integration affords opportunities for substantial cost savings, scheduling benefits, and preferred risk allocations. However, it also heightens the importance of capital project procurement processes, mostnotably development of contract terms and conditions. Several recent major water plant project procurements have been characterized by extensive delineation of design requirements and performance and technical specifications related toconstruction and facility operations. These processes have involved protracted discussions of risk allocation and labored negotiations of contract terms and conditions. This paper outlines the importance of both structured selection of alternative project delivery options, and subsequent procurement processes for contracting project delivery. Strategies for minimizing both procurement time and expenditures are discussed, as well as the implications of alternative approaches to risk allocation - the centerpiece of most integrated delivery contracts. The City of Houston's recent procurement of the Northeast WaterPurification Plant and initial transmission main serves as a case study example. Includes table, figures.
Edition : Vol. - No.
File Size : 1 file , 530 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 9
Published : 06/01/2001

History


Related products

AWWA ACE54428
Published Date: 06/01/2001
Optimization of Manganese Removal by Filtration
$7.2
AWWA ACE54313
Published Date: 06/01/2001
Bromate Control Under Exceptionally High Bromide-to-Bromate Conversion Conditions
$7.2
AWWA ACE54448
Published Date: 06/01/2001
Kansas Water Plan Programs for Reducing Unaccounted for Water
$7.2
AWWA ACE54326
Published Date: 06/01/2001
Facing Unique Challenges of Filtration Optimization at the Washington Aqueduct
$7.2

Best-Selling Products