AWWA ACE54288 PDF

AWWA ACE54288 PDF

Name:
AWWA ACE54288 PDF

Published Date:
06/01/2001

Status:
Active

Description:

How to Lower Your Electric Bill: A Utility Case Study

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Reducing operating costs has resurfaced as a primary objective for water utilities over the past few years. There is extreme pressure on utilities to maintain water rates or at the least, minimize rate increases, in the face of increased regulation, aging infrastructure, and the threat of privatization for municipal systems. To operate in this competitive business environment, water utilities must scrutinize their operating costs and reduce expenditures as appropriate. When segregated into broad cost categories, the most significant elements of a water utility budget include labor, chemicals, energy, and in many cases debt service on bond issues for capital projects. Traditionally, in the public sector, debt service on bond issues and labor costs have minimal flexibility, leaving chemical and energy costs with the greatest opportunities for cost reductions. As energy-intensive technologies (such as ultraviolet radiation, ozone, and membranes) become more prevalent in drinking water treatment, energy consumption is a more significant element of utility operating costs. In 1996, the City of Ann Arbor, Michigan, UtilitiesDepartment replaced chlorine with ozone as its primary disinfectant resulting in a 45 percent increase in electrical costs. Currently, annual energy costs top $1 million for the utility. Because of the significance of this cost category, the Water Utilities Department has focused on energy costs as one means for cost reduction. The Water Treatment Division within the Water Utilities Department was selected to pilot the development and implementation of the energy reduction plan. The Division used the following five-step process: understand the rate structure of electricity provider; install energy monitoring devices; develop load profiles to analyze usage; assess process modifications; and, implement recommendations and monitor.Components of the plan include electrical load monitoring, demand management, and energy-saving capital improvements. Constraints were established at the onset of the project to ensure that energy conservation was secondary to the Department mission to provide a safe and reliable water supply to its customers. Through these actions the Water Treatment Division expects to meet its goal of reducing electrical expenditures by five percent in the coming fiscal year, and potentially an additional five percent in the following fiscal year. By following these five steps, opportunities may exist for other water utilities to achieve comparable savings. Includes 6 references, table, figures.
Edition : Vol. - No.
File Size : 1 file , 510 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 16
Published : 06/01/2001

History


Related products

AWWA ACE54441
Published Date: 06/01/2001
The North Fork Project: Watershed Education and Information for Decision Makers
$7.2
AWWA ACE54376
Published Date: 06/01/2001
Chloramine Decay Rate: Factors and Research Needs
$7.2
AWWA ACE54323
Published Date: 06/01/2001
Long-Term, Full-Scale Evaluation of Ultraviolet Technology to Meet the Enhanced Surface Water Treatment Rules
$7.2
AWWA ACE54285
Published Date: 06/01/2001
Financing Water Services to the Poor: Do Subsidies Work? Empirical Evidence from Latin America
$7.2

Best-Selling Products

ETR 154
Published Date: 09/01/1997
Digital Video Broadcasting (DVB) - DVB Implementation Guidelines for the Use of MPEG-2 Systems Video and Audio in Satellite and Cable and Terrestrial Broadcasting Applications
$5.4