AWWA ACE54508 PDF

AWWA ACE54508 PDF

Name:
AWWA ACE54508 PDF

Published Date:
06/01/2001

Status:
Active

Description:

Water Restrictions That Work: The Summer of 2000 in Austin

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
From 1996 to 2000, the potential for water rationing existed in Austin, Texas, due to the rapidly increasing system demand in summer months approaching the capacity of the water plants to produce treated water. While the City's Water and Wastewater Utility had taken the necessary steps to increase water production capacity, it was a race to get the Ullrich pipeline completed that would boost system capacity before increasing demand by customers reached the capacity of the system. Prior to the summer of 2000, the projected completion date of the Ullrich pipeline was moved from May 2000 until late September 2000. In order to prepare for a situation where water had to be rationed, in 1999, the City updated its drought contingency plan and convened an interdepartmental working group that met regularly to develop procedures for implementing water rationing. While intensive public awareness efforts staved off water rationing for four summers, 1996-99, above normal temperatures and low rainfall combined with a continuous boom in development led to demand approaching available supply. In July 2000, Stage 2 restrictions were implemented and lasted for 69 days. The plans and the procedures developed by the interdepartmental working group led to a relatively smooth transition when restrictions were enacted. The restrictions were effective in dropping demand and then maintaining demand at a "safe" level that allowed sufficient capacity to be kept in reserve for fire and other emergencies. Includes figure.
Edition : Vol. - No.
File Size : 1 file , 260 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 8
Published : 06/01/2001

History


Related products

AWWA ACE54301
Published Date: 06/01/2001
Nitrite Formation Potential During Medium Pressure UV Disinfection of Drinking Water
$7.2
AWWA ACE54315
Published Date: 06/01/2001
Modeling Tools to Predict National Compliance Forecasts and DBP Exposure
$7.2
AWWA ACE54419
Published Date: 06/01/2001
Compliance With M/DBP Rules Using Integrated Membrane Systems
$7.2
AWWA ACE54287
Published Date: 06/01/2001
How to Measure Efficiency and How to Establish Goals for Efficiency Gains--Performance Benchmarking for Water Utilities
$7.2

Best-Selling Products

JIS A 0005:1966
Published Date: 01/01/1966
Standard nominal size of opening components for buildings
$25.5
JIS A 0007:1967
Published Date: 01/01/1967
Standard nominal size of steel framed wall component for buildings
$14.1
JIS A 0008:1967
Published Date: 01/01/1967
Standard nominal size of steel framed roof component for buildings
$11.7
JIS A 0012:1980
Published Date: 01/01/1980
Modular co-ordination -- Sizes of sanitary unit for dwellings
$15.3
JIS A 0015:1976
Published Date: 01/01/1976
Modular co-ordinating sizes of piping unit for dwellings
$12.9
JIS A 0016:1979
Published Date: 01/01/1979
Modular coordination-coordinating size of opening for built-in appliances in storage furniture
$19.2