AWWA ACE56170 PDF

AWWA ACE56170 PDF

Name:
AWWA ACE56170 PDF

Published Date:
06/16/2002

Status:
Active

Description:

Appropriate Design Criteria Packages for Membrane Facility Procurement by the Design-Build Operate Process

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
To date, few membrane treatment facilities have been procured using a design-build (DB) or design-build-operate (DBO) approach. Due to permeate water quality and operational criteria differences between membrane manufacturers and their specific membrane models, care must be taken to accommodate all potential membrane suppliers. This need is further emphasized by the fact that there are relatively few suppliers of membranes to the municipal market and the loss of one potential bidder could adversely impact bid competitiveness. Other factors crucial to a successful design package are a comprehensive raw water quality adjusted for potential future conditions and the assessment of required pre- and post-treatment. To illustrate an appropriate design package for a membrane facility to be procured by a DB procedure, a case study for the Mid-Pinellas Brackish Water Facility in Florida is presented. The Mid-Pinellas facility will be owned by Tampa Bay Water and will be part of an ambitious strategy to diversify water supply sources in this water resource-limited area. Tampa Bay Water already has significant surface water and saline water (desalination) treatment plant projects underway using DBO procurement approaches. This project would utilize brackish groundwater, thus tapping a new water supply source for the utility. This facility will be somewhat unique in that the necessary recovery rate and subsequent process design is governed by the need to achieve a certain, relatively high TDS concentration in the reject water to allow deep well disposal. In addition, while the facility will be procured by a DBO approach, the supply wells and concentrate injection wells along with associated pipelines will be procured using traditional design-bid-build (DBB) approaches. The planned 5- mgd facility using brackish groundwater could service as a model facility all along the southwest coastal areas of Florida. The concepts related to the design package are applicable to any membrane project using a DB or DBO approach. Includes tables.
Edition : Vol. - No.
File Size : 1 file , 320 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 16
Published : 06/16/2002

History


Related products

AWWA ACE56144
Published Date: 06/16/2002
Full Scale Validation Testing of Large UV-Reactors - the German DVGW Standard W294
$7.2
AWWA ACE56162
Published Date: 06/16/2002
Eastern Water Wars: Virginia v. Maryland
$7.2
AWWA ACE56171
Published Date: 06/16/2002
Process Selection, Design and Equipment Selection Under Design-Build-Operate Constraints
$7.2
AWWA ACE56188
Published Date: 06/16/2002
Practical Considerations for Design and Construction of a Full-Scale UV Disinfection System
$7.2

Best-Selling Products

ISTA 2A
Published Date: 01/01/2008
ISTA Preshipment Testing Procedures - Combination Tests for packaged-products weighing 150 lbs. (68kg) or less
ISTA 2A
Published Date: 2011
Packaged-products weighing 150 lbs. (68kg) or less (Editorial Change, 2012)
$28.5
ISTA 2B
Published Date: 2011
Packaged-products weighing over 150 lbs. (68kg) (Editorial Change, 2012)
$28.5
ISTA 2C
Published Date: 2011
Furniture Packages (Editorial Change, 2012)
$28.5
ISTA 3A
Published Date: 02/01/2008
Packaged-Products for Parcel Delivery System Shipment 70 kg (150 lb) or Less (Editorial Change, 2016)
$28.5
ISTA 3A
Published Date: 03/01/2018
Packaged-Products for Parcel Delivery System Shipment 70 kg (150 lb) or Less
$28.5