AWWA ACE58276 PDF

AWWA ACE58276 PDF

Name:
AWWA ACE58276 PDF

Published Date:
06/15/2003

Status:
Active

Description:

Meeting Expansion, Upgrade and Regulatory Pressures in Parallel - the Region of Peel's Total Water Quality Management Plan

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This paper focuses on the South Peel Water System, located in the Region of Peel within the Greater Toronto Area (GTA) in the province of Ontario, Canada. Both of the water treatment plants in the South Peel system are conventional treatment plants. The Lakeview WTP, originally constructed in 1951, has a capacity of 560 ML/d (147 MGD). The Lorne Park WTP, originally constructed in 1976 and expanded in 2002, has a capacity of 340 ML/d (90 MGD). Peel's Water and Wastewater Master Plan identifies the requirements for additional capacity to service increased water demands in the Region. The expansion of the Lakeview WTP was identified in the Master Plan as a requirement to accommodate future population growth in Peel. Along with the expansion of the Lakeview WTP, upgrades to the existing systems at the both plants are necessary. These upgrades are required for the plants to continue to meet and/or exceed current drinking water regulations established by the provincial government. The Ontario Ministry of the Environment (MOE) introduced new Ontario Drinking Water Standards in August 2000 (with some minor modifications in January 2001). Based on a review of federal and provincial legislation, as well as directions set by the U.S. Environmental Protection Agency, the Region of Peel has established water quality parameters for the expansion of the plant that will exceed the requirements established by the provincial government. The need for increased capacity at the Lakeview plant also means that the upgrades to the existing plant will be part of the same construction schedule. Includes table.
Edition : Vol. - No.
File Size : 1 file , 270 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 12
Published : 06/15/2003

History


Related products

AWWA ACE58127
Published Date: 06/15/2003
Integration of Membranes into an Existing Water Treatment Facility: Performance of Membranes in Treating Surface Water with and without Pretreatment
$7.2
AWWA ACE58152
Published Date: 06/15/2003
Life Cycle Cost Savings Opportunities in Pumping Systems
$7.2
AWWA ACE58189
Published Date: 06/15/2003
A Better Way to do Membrane Bioreactors: Study of a Novel Hybrid Sorption-Membrane-Bioreactor Process for Concurrent Removal of Ammonia, Iron and Manganese
$7.2
AWWA ACE58200
Published Date: 06/15/2003
Vulnerability Assessment Case Studies, Lessons Learned and Applications for Small Systems
$7.2

Best-Selling Products

RMA IP-1
Published Date: 01/01/1989
Conveyor and Elevator Belt Handbook
RMA IP-20
Published Date: 01/01/2007
Specification for Drives Using Classical V-Belts and Sheaves, Fourth Edition
RMA IP-21
Published Date: 01/01/1991
Specifications for Drives Using Double-V (Hexagonal) Belts (Joint RMA/MPTA/RAC), Third Edition, 1991, reaffirmed 1997
RMA IP-22
Published Date: 01/01/2007
Specifications for Drives Using Narrow V-Belts and Sheaves, Fourth Edition
RMA IP-23
Published Date: 01/01/1991
Specifications for Drives Using Light Duty Single V-Belts (Joint RMA/MPTA), Third Edition, 1991, reaffirmed 1997
RMA IP-25
Published Date: 01/01/1991
Specifications for Drives Using variable Speed V-Belts (Joint RMA/MPTA/RAC), Third Edition, 1991, reaffirmed 1997