AWWA ACE61871 PDF

AWWA ACE61871 PDF

Name:
AWWA ACE61871 PDF

Published Date:
06/17/2005

Status:
Active

Description:

How Distribution Quality Can Drive Treatment Process Design: Saws First Treatment Plant

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This paper presents the Integration Study methodology, the resulting finished water goals, and the treatment process design for the Twin Oaks Water Treatment Plant, which is part of the San Antonio Water System (SAWS) Carrizo ASR Project. The Carrizo ASR Project is a conjunctive use water supply project that utilizes water from the Carrizo Aquifer in South Bexar County, Texas. Phase 1 of the program consists of a new production well field that is capable of producing 30 mgd. These initial wells will feed a new 30 mgd water treatment plant (Twin Oaks) designed to remove high levels of dissolved iron, manganese, carbon dioxide, and hydrogen sulfide. The treated groundwater will then be conveyed approximately 25 miles where it enters the SAWS distribution system. Phase II of the project will increase the aquifer storage capacity of the project to 60 mgd, and make provisions to utilize additional Carrizo Aquifer groundwater from Gonzales County. Since Edwards Aquifer groundwater only requires disinfection, the new Twin Oaks Water Treatment Plant is the first potable water treatment facility to be constructed by SAWS. As described in this paper, the design of the treatment process for this facility was influenced not only by the need to remove contaminants from the south Bexar Carrizo groundwater, but by the recommendations of the Integration Study, which proved that substantial treatment was also needed to reduce the possibility of water quality impacts when the new water source is introduced into SAWS distribution system. Includes 2 references, tables, figures.
Edition : Vol. - No.
File Size : 1 file , 1.7 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 19
Published : 06/17/2005

History


Related products

AWWA ACE61688
Published Date: 06/17/2005
A New AwwaRF/CEC Research Project: Zero Liquid Discharge for Inland Desalination
$7.2
AWWA ACE61696
Published Date: 06/17/2005
Locating Contaminant Warning System Monitors in Water Distribution Systems
$7.2
AWWA ACE61776
Published Date: 06/17/2005
Emerging Water Quality Concerns Associated with Integrating Desalinated Seawater into Existing Distribution Systems
$7.2
AWWA ACE61830
Published Date: 06/17/2005
Changing Pumps to Meet Changing Water System Demands
$7.2

Best-Selling Products

EIP -- Energy Efficiency Manual
Published Date: 2000
$63