AWWA ACE65217 PDF

AWWA ACE65217 PDF

Name:
AWWA ACE65217 PDF

Published Date:
06/01/2007

Status:
Active

Description:

Tough Choices in Paradise: Capital Project Prioritization on Oahu

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
In 2005, the Honolulu Board of Water Supply conducted a study of system needs and anticipated capital spending over a 20-year horizon, from 2006 through 2025. In the course of this study, the Board identified a range of capital investment needs in the categories of water source, transmission, and storage projects. In addition, investment needs were identified for the ongoing rehabilitation and replacement of the Board's existing system. With these spending needs defined, the Board developed a Capital Plan that prioritized projects for implementation over an initial 6-year planning horizon (calendar year 2006-2011) and a 20-year planning horizon (2006-2025). The 6-year Capital Plan calls for implementation of projects with a total cost of approximately $264 million (in 2006 dollars). Spending on these projects during the 6-year period is anticipated to total approximately $214 million (in 2006 dollars). These required investments will affect the costs of continued utility system operation and service. To manage these costs, the Board concurrently developed a Strategic Financial Plan that outlines financial and rate-making strategies for a 10-year planning horizon extending from 2006 through 2015. For the Board's capital planning purposes, it was necessary to divide Oahu into distinct areas that are served by integrated components of the Board's water system. For each of these Capital Plan Districts, the Board developed a Capital Plan that ties together population and water demand projections, resource plans, capital projects, and level-of-service standards. These Capital Plans identify future needs for each district in terms of source, storage, transmission, waterline replacement and system improvements. The paper discusses seven steps in the capital planning process that include: Step 1, Input to the Capital Planning Process; Step 2, Needs Assessment; Step 3, Project Definition; Step 4, Project Prioritization; Step 5, Financial Impacts Analysis; Step 6, Capital Plan Alternatives; and, Step 7, Financial and Rate Planning. Includes tables, figures, appendix.
Edition : Vol. - No.
File Size : 1 file , 1.3 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 38
Published : 06/01/2007

History


Related products

AWWA ACE65377
Published Date: 06/01/2007
Nanotechnology, Nanoparticles and Drinking Water: Threats and Opportunities
$7.2
AWWA ACE65115
Published Date: 06/01/2007
Degradation of Domoic Acid Toxin by UV Promoted Fenton-like Processes
$7.2
AWWA ACE65120
Published Date: 06/01/2007
EPCOR, Edmonton, Alberta, Canada: Only Tap Water Delivers
$7.2
AWWA ACE65619
Published Date: 06/01/2007
How Are We Going to Provide Them Water? Evaluating Water Supply Strategies in a Complex, High Growth Environment
$7.2

Best-Selling Products

SN/TS 3031:2016
Published Date: 11/15/2016
Energy performance of buildings - Calculation of energy needs and energy supply
SN/TS 3032:2024
Published Date: 07/05/2024
Energy performance of buildings - Calculation of heating, cooling and power demand
SN/TS 3079:2010
Published Date: 04/28/2010
Strength graded structural timber - Dimensions
SN/TS 3160:2017
Published Date: 10/01/2017
Module based doors, windows and recessing for locking systems
SN/TS 3183:2008
Published Date: 12/01/2008
Solid softwood panelling for interior use
SN/TS 3186:2008
Published Date: 12/01/2008
Solid softwood cladding for exterior use