This powerpoint presentation begins by providing a brief overview of a phased expansion plan for the Yuba City water treatment plant. Alternatives for plant expansion are presented, and an upgrade of the existing Flocculation/Sedimentation basins was selected that included an
expansion with submerged membranes. Submerged membrane design is presented, along with the CIP/backwash system, important factors for submerged
membrane retrofit, commissioning and start-up issues, commissioning data and summary, and operating data. Includes tables, figures.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 1.3 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 26 |
| Published : | 11/01/2008 |