Forsyth County Water Treatment Plant Membrane Proof Test: Challenges, Solutions, and Results

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Forsyth County, Georgia contracted with CH2M HILL to expand the Forsyth County Water Treatment Plant (WTP) to a rated capacity of 28 million gallon per day (mgd). The new process trains included rapid mix, clarification (plate settlers), membranes, and disinfection with sodium hypochlorite. The ZeeWeed Ultrafiltration System, manufactured by Zenon Membrane Solutions, of GE Water & Process Technologies was selected. In order to provide clarified water for the membranes and simplify the proof testing setup, clarified water was pumped from the existing Superpulsator® effluent to the pilot membrane unit. However, once operations began, it was quickly determined that the polymer used by the plant was incompatible with the membranes. This was remedied by changing approaches and renting a Meurer Research, Inc. (MRI) Pilot Plate Clarifier to provide clarified water to the membrane pilot unit and to more accurately simulate the proposed process trains. The MRI clarifier was operated with alum as a coagulant and without the use of polymers. However, challenges still remained, including: controlling the dissolved aluminum concentration in the clarifier effluent to prevent additional membrane fouling; a lack of operational flexibility with the raw water pump station and, therefore, a lack of control of the raw water flow rate to the plant; significant peaks and lows of water demand based on outdoor watering restrictions under Georgia Level 2 drought watering restrictions; and, cycling between operating at or near capacity and then shutting off during the low demand periods. During periods when the plant was shut off, there was no raw water to operate the clarifier or membrane pilot units, thus creating poor clarifier performance and yielding incomplete membrane performance data. This paper discusses the challenges encountered throughout the process, including the polymer incompatibility, dissolved aluminum concentrations, plant on-off cycle, and other challenges such as air-entrained rising floc in the clarifier and mechanical equipment malfunctions. The paper also describes the solutions to these challenges and the overall pilot process design. Includes reference, tables, figures.
Edition : Vol. - No.
File Size : 1 file , 1.1 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 31
Published : 11/01/2008

History


Related products

AWWA ACE68953
Published Date: 11/01/2008
Detection of Episodic and Low-Level Concentrations of Emerging Wastewater Contaminants in Drinking Water
$7.2
AWWA ACE69112
Published Date: 11/01/2008
WaterWiser Confidential: Creating, Developing, and Maintaining Web-Based Conservation Resources
$7.2
AWWA ACE68703
Published Date: 11/01/2008
In Situ Polyurethane Lining Impacts on DBPs, SVOCs, Tastes & Odors and Disinfectant Residuals
$7.2
AWWA ACE69126
Published Date: 11/01/2008
Aquifer Storage and Recovery: Application for Drought Management and Ecosystem Protection
$7.2

Best-Selling Products

PCA DX074D
Published Date:
High Strength Bars as Concrete Reinforcement, Part 6. Fatigue Tests
PCA DX093D
Published Date:
Fatigue Tests of Reinforcing Bars
PCA DX139P
Published Date:
Influence of Aggregate Properties on Effectiveness of Interlock Joints in Concrete Pavements
PCA DX145D
Published Date:
Fatigue Tests of Reinforcing Bars-Effect of Deformation Pattern
PCA EB001.15
Published Date: 2011
Design and Control of Concrete Mixtures, 15th edition
PCA EB001.16
Published Date: 2016
Design and Control of Concrete Mixtures, 16th edition