This powerpoint presentation begins by providing a brief overview of distribution system optimization criteria and chlorine residual at
Park Water Systems. Chlorine residual findings are presented, along with challenges from chlorine assessment. A main break at Pinellas County
Distribution System is presented, including water loss and main break tracking, and defining calculation of water loss. Pressure management at Newport
News Waterworks is presented, including a summary of main breaks and leaks, benefits of main breaks assessment, and pressure management findings. Presentation summary indicates: early indication showed common themes of
engaging different groups in optimization
effort; real value in aiding capital improvement projects; value will be realized when utilities enroll in
program; and, self-assessment and path to optimization is
key, not in the receipt of the award.
Includes table, figure.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 1.2 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 21 |
| Published : | 11/01/2009 |