AWWA ACE71010 PDF

AWWA ACE71010 PDF

Name:
AWWA ACE71010 PDF

Published Date:
11/01/2009

Status:
Active

Description:

The Cost of Developing Alternative Water Supplies in South Florida

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This powerpoint presentation begins by providing a brief overview of the South Florida Water Management District (SFWMD) is responsible for preparing water supply plans for its district that address demands which would exceed available supply over the next 20 years during a 1-in-10 year drought. Latest supply plan indicates traditional supplies will not meet demand over next 20 years. Supply plans have identified 1.5 bgd of alternative supplies that could be implemented by 2025. Nanofiltration is presented as baseline for water treatment alternatives, along with the cost basis for treatment options, wastewater reuse viewed as a major alternative supply source, higher levels of treatment needed to satisfy more stringent regulations, scope of membrane bioreactors, and South District Water Reclamation Plant Facilities project implementation. Includes figures.
Edition : Vol. - No.
File Size : 1 file , 5.5 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 44
Published : 11/01/2009

History


Related products

AWWA ACE70820
Published Date: 11/01/2009
Strategic Planning, Organizational Change, and Performance Management at Aurora Water
$7.2
AWWA ACE70675
Published Date: 11/01/2009
Criteria for Optimized Distribution Systems: Project Overview
$7.2
AWWA ACE70672
Published Date: 11/01/2009
Softening and Radionuclide Removal from Groundwater Containing Iron and Manganese with Reverse Osmosis: From Pilot to Full Scale
$7.2
AWWA ACE70658
Published Date: 11/01/2009
Drought Overview: A Tale of Two Regions
$7.2

Best-Selling Products