AWWA ACE71093 PDF

AWWA ACE71093 PDF

Name:
AWWA ACE71093 PDF

Published Date:
11/01/2009

Status:
Active

Description:

Simultaneous Compliance with Stage 2 DBPR and the Lead and Copper Rule: A Road Map

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This powerpoint presentation begins by providing a brief overview of soluble and particulate corrosion. A study is presented of balancing disinfectant residual with the Lead and Copper Rule at Dartmouth, Massachusetts. Well sources were treated by greensand filtration, chlorine was added as a residual disinfectant in distribution system and no phosphate inhibitor was used, just pH adjustment. Water was purchased from New Bedford, MA, in summer periods. New Bedford used chloramines as residual disinfectant. Regulatory issues faced by Dartmouth are presented, along with scale on the interior of the pipe and the influence of residual disinfectant on the scale. Methodology included small scale test simulation of pipe loop, coupon test, and performing scale analysis on existing pipe. Includes table, figures.
Edition : Vol. - No.
File Size : 1 file , 1.3 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 21
Published : 11/01/2009

History


Related products

AWWA ACE71026
Published Date: 11/01/2009
Effluent - Providing Energy for Future Generations from Wastewater in the Las Vegas Valley
$7.2
AWWA ACE70729
Published Date: 11/01/2009
Why Don't Utilities Get Tangible Savings from Their Automation?
$7.2
AWWA ACE70675
Published Date: 11/01/2009
Criteria for Optimized Distribution Systems: Project Overview
$7.2
AWWA ACE70477
Published Date: 11/01/2009
Water Projects and Opportunities in the State of Mexico
$7.2

Best-Selling Products

ARCHIVE
Published Date: